Agenda item

(A) DCCE2004/2089/F and (B) DCCE2004/2090/L - Land to the Rear of 71 St Owen Street, Hereford, HR1 2JQ

Erection of three linked dwellings fronting Harrison Street.

Minutes:

(A) Erection of three linked dwellings fronting Harrison Street and (B) Erection of three linked dwellings with arched access to rear.

 

The Development Control Manager reported that the County Archaeologist recommended an archaeological evaluation of the site, including a trial trench, before the commencement of the development.  The Development Control Manager advised that a dispute between the owners of this site and the owners of an adjoining property was a civil matter but it was hoped that this would be resolved before planning permission was issued.

 

The Chairman, speaking in his capacity as Local Member, noted the constraints of the plot of land but felt that, subject to a number of issues being addressed, the proposal represented an imaginative use of the site.

 

RESOLVED:

 

With respect to DCCE2004/2089/F:

 

That subject to the completion of initial archaeological investigations and submissions and the receipt of amended plans in relation to the neighbouring property, the Officers named in the Scheme of Delegation to Officers be authorised to issue planning permission subject to the following conditions and any additional conditions considered necessary by Officers:

 

1       A01 (Time limit for commencement (full permission))

 

         Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990.

 

2       B01 (Samples of external materials)

 

         Reason: To ensure that the materials harmonise with the surroundings.

 

3       H13 (Access, turning area and parking)

 

         Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway.

 

4       G04 (Landscaping scheme (general))

 

         Reason: In order to protect the visual amenities of the area.

 

5       G05 (Implementation of landscaping scheme (general))

 

         Reason:  In order to protect the visual amenities of the area.

 

6       E16 (Removal of permitted development rights)

 

         Reason: [Special Reason].

 

7       E19 (Obscure glazing to windows)

 

         Reason: In order to protect the residential amenity of adjacent properties.

 

8       F16 (Restriction of hours during construction)

 

         Reason: To protect the amenity of local residents.

 

9       W01 (Foul/surface water drainage)

 

         Reason: To protect the integrity of the public sewerage system.

 

10     W02 (No surface water to connect to public system)

 

         Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment.

 

11     W03 (No drainage run-off to public system)

 

         Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment.

 

Informatives:

 

1       N03 - Adjoining property rights

 

2       N14 - Party Wall Act 1996

 

3       The proposed development site is crossed by a public sewer with the approximate position being marked on the attached Statutory Public Sewer Record.  Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times.  No part of the building will be permitted within 3 metres either side of the centreline of the public sewer.

 

4       N15 - Reason(s) for the Grant of PP/LBC/CAC

 

With respect to DCCE2004/2090/L:

 

That subject to the resolution of all matters with regard to DCCE2004/2089/F Officers be authorised to issue Listed Building Consent subject to the following conditions and any additional conditions considered necessary by officers:

 

1.      C01 (Time limit for commencement (Listed Building Consent)

 

Reason: Required to be imposed by Section 18(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990.

Supporting documents: