DCSE2004/1789/F - DCSE2004/1790/C - FORMER ALTON COURT BREWERY, STATION STREET, ROSS-ON-WYE, HEREFORDSHIRE (Agenda Item 11)

Erection of three storey sheltered accommodation.

 

Demolition works to accommodate construction of retirement flats

Minutes:

Erection of three storey sheltered accommodation.

 

Demolition works to accommodate construction of retirement flats

 

The Team Leader (Southern) confirmed that a sum of £164,500 had been offered by the developer in order to contribute to the offsite provision of affordable housing in Ross-on-Wye, this sum would be secured through a section 106 agreement. He advised Members that a condition should be added to restrict the sale of the dwellings to Ross-on-Wye residents or people with strong links to the area for a limited time. He also advised that a condition should be added regarding the age range of the occupants of the units.

 

Councillor Mrs. C.J. Davis, the Local Ward Member, noted the concerns of the residents and the Parish Council regarding problems with foul drainage in the area. As a result of this she felt that she could not support the application.

 

Some Members raised concerns regarding the suitability of the proposed design in this location.

 

In response to a number of concerns raised by Members, the Team Leader (Southern) advised that Welsh Water and the Environment Agency had raised no objections to the application and felt that the development should not have an adverse effect on the drainage system.

 

A motion to refuse the application failed and the Sub-Committee subsequently agreed the resolution detailed below.

 

RESOLVED

 

With respect to DCSE2004/1789/F:

 

That       1)      the County Secretary and Solicitor be authorised to complete a planning obligation under Section 106 of The Town and Country Planning Act 1990 to deal with a contribution to the provision off-site of affordable housing in Ross-on-Wye and any additional matters and terms as she considers appropriate

 

               2)      upon completion of the aforementioned planning obligation that the Officers named in the Scheme of Delegation to Officers be authorised to issue planning permission subject to the following conditions and any other conditions considered appropriate:

 

1       A01 (Time limit for commencement (full permission))

 

Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990.

 

2       A07 (Development in accordance with approved plans)

 

Reason: To ensure adherence to the approved plans in the interests of a satisfactory form of development.

 

3       B01 (Samples of external materials)

 

Reason: To ensure that the materials harmonise with the surroundings.

 

4       C02 (Approval of details)

 

         Reason: To safeguard the character and appearance of this building of [special] architectural or historical interest.

 

5       D02 (Archaeological survey and recording)

 

         Reason: A building of archaeological/historic/architectural significance will be affected by the proposed development.  To allow for recording of the building during or prior to development.  The brief will inform the scope of the recording action.

 

6       G01 (Details of boundary treatments)

 

         Reason: In the interests of visual amenity and to ensure dwellings have satisfactory privacy.

 

7       G04 (Landscaping scheme (general))

 

         Reason: In order to protect the visual amenities of the area.

 

8       G05 (Implementation of landscaping scheme (general))

 

         Reason:  In order to protect the visual amenities of the area.

 

9       H03 (Visibility splays)

 

         Reason: In the interests of highway safety.

 

10     H05 (Access gates)

 

         Reason: In the interests of highway safety.

 

11     H13 (Access, turning area and parking)

 

         Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway.

 

12     H21 (Wheel washing)

 

         Reason: To ensure that the wheels of vehicles are cleaned before leaving the site in the interests of highway safety.

 

13     H27 (Parking for site operatives)

 

         Reason: To prevent indiscriminate parking in the interests of highway safety.

 

14     H29 (Secure cycle parking provision)

 

         Reason: To ensure that there is adequate provision for secure cycle accommodation within the application site, encouraging alternative modes of transport in accordance with both local and national planning policy.

 

15     No development shall take place until the following has been submitted to and approved in writing by the local planning authority:

 

a)    a 'desk study' report documenting the history of the site and its surrounding area and likelihood of contaminant extent and type

 

b)    if the study confirms the possibility of contamination, a site investigation report documenting the ground conditions of the site, incorporating a "conceptual model" of all the potential pollutant linkages and an assessment of risk to identified receptors

 

c)    if risk assessment identifies unacceptable risk(s) a detailed scheme specifying remedial works and measures necessary to avoid risk from contaminants/or gases when the site is developed.  The Remediation Scheme shall include consideration of and proposals to deal with situations where, during works on site, contamination is encountered which has not previously been identified.  Any further contamination shall be fully assessed and an appropriate remediation scheme submitted to the local planning authority for written approval.

 

Reason: To ensure that potential contamination is removed or contained to the satisfaction of the local planning authority.

 

16     The Remediation Scheme, as approved pursuant to condition no. 15 above, shall be fully implemented before the development is first occupied.  Any variation to the scheme shall be agreed in writing with the local planning authority in advance of works being undertaken.  On completion of the remediation scheme the developer shall provide written confirmation that all works were completed in accordance with the agreed details.

 

Reason: To ensure that potential contamination is removed or contained to the satisfaction of the local planning authority.

 

17     F16 (Restriction of hours during construction)

 

         Reason: To protect the amenity of local residents.

 

18     Foul water and surface water discharges must be drained separately from the site.

 

Reason:  To protect the integrity of the public sewerage system.

 

19     No surface water shall be allowed to connect (either directly or indirectly) to the public sewerage system.

 

Reason:  To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment.

 

20     No land drainage run-off will be permitted, either directly or indirectly, to discharge into the public sewerage system.

 

Reason:  To prevent hydraulic overload of the public sewerage system and pollution of the environment.

 

21     No development shall commence until the developer has prepared a scheme for the comprehensive and integrated drainage of the site showing how foul water, surface water and land drainage will be dealt with and this has been agreed in writing by the local planning authority in liaison with Dwr Cymru Welsh Water's Network Development Consultant.

 

Reason:  To ensure that effective drainage facilities are provided for the proposed development, and that no adverse impact occurs to the environment or the existing public sewerage system.

 

22     F48 (Details of slab levels)

 

         Reason: In order to define the permission and ensure that the development is of a scale and height appropriate to the site.

 

23     Prior to the commencement of development the siting and details of any electricity sub-station shall be submitted to and be approved in writing by the local planning authority.  The work shall be carried out in accordance with the approved details.

 

Reason:  In order to protect the amenities of adjoining property.

 

Informatives:

 

1       HN05 - Works within the highway

 

2       HN09 - Drainage details for Section 38

 

3       HN10 - No drainage to discharge to highway

 

4       N15 - Reason(s) for the Grant of Planning Permission

 

 

 

With respect to DCSE2004/1790/C:

 

That Conservation Area Consent be granted subject to the following condition:

 

1       C01 (Time limit for commencement (Listed Building Consent))

 

Reason: Required to be imposed by Section 18(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990.

Supporting documents: