Agenda item

DCNC2007/3045/O - Land south east of The Lodge, Hatfield, Leominster, Herefordshire

Proposed site for the erection of a 12,000 bird free range organic egg laying unit.

 

Ward: Hampton Court

Minutes:

The Principal Planning Officer presented the following updates:

 

Additional comments have been received from the Council’s Public Rights of Way Officer reinforcing the concerns relating to the proximity of the building to the public bridleway.  A request is made that the building and ancillary structures should be a minimum of 10 metres from the centre line of the bridleway.

 

Officer’s Comment

 

There is scope for the position of the building to be amended in order that it is further away from the bridleway.  It is considered that it could be moved by 5 metres and this would leave its rear elevation in the region of 10 metres from the bridleway as requested.  Any further would begin to compromise the landscape impact of the building as the benefit that the contours of the land offer would be lost to a degree.

 

Conclusion

 

That a condition is added relating to the slab level of the building (F48)

 

In accordance with the criteria for public speaking, Mr Miles spoke against the application. 

 

RESOLVED

 

That the Officers named in the Scheme of Delegation to Officers be authorised to approve the application, subject to the location of the building being moved a further five metres from the public bridleway and subject to the following conditions:

 

1.      A02 (Time limit for submission of reserved matters (outline permission)).

 

Reason: Required to be imposed by Section 92 of the Town and Country Planning Act 1990.

 

2.      B08 (Dark roof colouring (agricultural buildings)).

 

Reason: To protect the visual amenities of the area.

3.      B10 (Details of cladding (agricultural and industrial buildings).

 

Reason: To minimise the visual impact of the development.

 

4.            Details of the colour and specification of the feed bins shall be submitted to and agreed in writing by the local planning authority before development commences.

 

Reason: To minimise the visual impact of the development.

 

5.      F18 (Scheme of foul drainage disposal).

 

Reason: In order to ensure that satisfactory drainage arrangements are provided.

 

6.      F32 (Details of floodlighting/external lighting).

 

Reason: To safeguard local amenities.

 

7.            F48 (Slab levels)

 

Reason: to define the permission and ensure the development is appropriate to the site.

 

8.      Prior to the commencement of development, a scheme for the disposal of dead birds shall be submitted to and approved in writing by the local planning authority.  The scheme approved shall be subsequently implemented and permanently retained unless otherwise agreed in writing by the local planning authority.  The details to be included in the scheme will relate to:

specification and details of manufacturer of any incinerator

          Location of any incinerator

          Hours of use of incinerator

          Details of the storage of fallen stock/ prior to incineration or collection

 

Reason: To protect the amenity of nearby properties and prevent pollution.

 

8.      Prior to the commencement of development, a scheme for the disposal of poultry litter and waste shall be submitted to and approved in writing by the local planning authority.  The scheme approved shall be subsequently implemented and permanently retained unless otherwise agreed in writing by the local planning authority.

 

Reason: To protect the amenity of nearby properties and prevent pollution.

 

9.      The loading or unloading of delivery/collection vehicles together with their arrival and departure from the site shall not take place outside the hours of 7:00 am and 9:00 pm.

        

Reason: To safeguard the amenities of the locality.

 

10.    Prior to its installation and first use of the building hereby granted details of the ventilation equipment, including noise levels, shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the details so approved.

        

Reason: To protect the residential amenities of the area.

 

11.    F39 (Scheme of refuse storage).

 

Reason: In the interests of amenity.

 

12.    F40 (No burning of material/substances).

 

Reason: To safeguard residential amenity and prevent pollution.

 

13.    H01 (Single access - not footway).

 

Reason: In the interests of highway safety.

 

14.    H05 (Access gates).

 

Reason: In the interests of highway safety.

 

15.    H08 (Access closure).

 

Reason: To ensure the safe and free flow of traffic using the adjoining County highway.

 

16.    H13 (Access, turning area and parking).

 

Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway.

 

17.    G01 (Details of boundary treatments).

 

Reason: In the interests of visual amenity and to ensure dwellings have satisfactory privacy.

 

18.    G04 (Landscaping scheme (general)).

 

Reason: In order to protect the visual amenities of the area.

 

19.    G05 (Implementation of landscaping scheme (general)).

 

Reason: In order to protect the visual amenities of the area.

 

20.    No development shall take place until full details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority and these works shall be carried out as approved.  These details should include proposed finished levels or contours and gradients; means of enclosure; car parking layout; vehicle and pedestrian access; field boundary alongside public highway; hard surfacing materials, proposed functional services above and below ground e.g. drainage power, communications, cables, pipelines etc.

 

Reason: In the interests of visual amenity.

 

Informatives:

 

1.      N15 - Reason(s) for the Grant of PP/LBC/CAC.

2.      N19 - Avoidance of doubt.

 

3.      HN01 - Mud on highway.

 

4.      HN04 - Private apparatus within highway.

 

5.      HN05 - Works within the highway.

 

6.      HN10 - No drainage to discharge to highway.

 

7.      HN22 - Works adjoining highway.

Supporting documents: