21/09/2017 - Public spaces protection order alcohol control

To approve the public spaces protection order for alcohol control.

Decision Maker: Director for economy, communities and corporate

Decision due date: 17/10/2017

Wards affected: (All Wards);

Lead officer: David Hough

Notice of decision: 21/09/2017

Anticipated restriction: Open


21/09/2017 - Public spaces protection order for Dog Control

To approve the public spaces protection order for dog control.

Decision Maker: Director for economy, communities and corporate

Decision due date: 10/10/2017

Wards affected: (All Wards);

Lead officer: David Hough

Notice of decision: 21/09/2017

Anticipated restriction: Open


21/09/2017 - 2018/19 capital bids and approval

To approve the proposed capital budget 2018/19

Decision Maker: Council

Decision due date: 26/01/2018

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 21/09/2017

Anticipated restriction: Open


20/09/2017 - South Wye Transport Package

To consider consultation feedback and confirm next steps of delivery of Active Travel Measures (ATM), to confirm making of the Compulsory Purchase Order (CPO) and Side Roads Order (SRO) and to approve the procurement of a contractor for the Southern Link Road (SLR).

Decision Maker: Cabinet

Decision due date: 12/10/2017

Wards affected: Belmont Rural; Hinton & Hunderton; Stoney Street; Wormside;

Lead officer: Mairead Lane

Notice of decision: 22/06/2017

Anticipated restriction: Open


20/09/2017 - Appointment of insurance broker

To decide to appoint Marsh Ltd. as the council's insurance broker for three years from 1st December 2017 with an option to extent for a further two years following a tender exercise,

Decision Maker: Director for economy, communities and corporate

Decision due date: 29/09/2017

Lead officer: Malcolm Green

Notice of decision: 20/09/2017

Anticipated restriction: Open


19/09/2017 - Herefordshire's Better Care Fund (BCF) and Integration Plan 2017-2019 and extension of s.75 agreement

To agree the extension of the existing section 75 agreement to March 2019 and note the council's contribution to the Herefordshire's Better Care Fund (BCF) and Integration Plan 2017-2019

Decision Maker: Cabinet

Decision due date: 16/11/2017

Wards affected: (All Wards);

Lead officer: Amy Pitt

Notice of decision: 19/09/2017

Anticipated restriction: Open


15/09/2017 - JADU Support License

To secure approval for the continued provision of license and support of the JADU web application suite which support the public facing website.

Decision Maker: Director for economy, communities and corporate

Decision due date: Before 27/09/2017

Wards affected: (All Wards);

Lead officer: Tim Brace

Notice of decision: 15/09/2017

Reason for urgency:
Due date for payment was 1st Sept but delayed due to negotiations on price over an extended period.

Anticipated restriction: Open


15/09/2017 - Task and Finish Group Report: Devolution

To consider recommending the findings to the executive.

Decision Maker: General scrutiny committee

Decision due date: 13/11/2017

Wards affected: (All Wards);

Lead officer: Tim Brown

Notice of decision: 15/09/2017

Anticipated restriction: Open


14/09/2017 - Travellers’ sites development plan document

Cabinet to recommends to Council that, following the completion of the pre-submission publication of the Herefordshire Travellers Sites Development Plan Document 2011 – 2031 and its supporting documents,
the documents be submitted to the Secretary of State for Examination in Public;

Decision Maker: Council

Decision due date: 13/10/2017

Wards affected: Arrow; Bromyard Bringsty; Dinedor Hill; Leominster East; Redhill;

Lead officer: Angela Newey

Notice of decision: 14/09/2017

Anticipated restriction: Open


14/09/2017 - Adoption of the Vowchurch and District Group neighbouhood development plan and consequential updates to the countywide policies map

To make the Vowchurch and District Group neighbourhood development plan as part of the statutory development plan for Herefordshire and approve the consequential updates to the countywide policies map.

Decision Maker: Cabinet member infrastructure

Decision due date: 10/2017

Wards affected: Golden Valley South;

Lead officer: Samantha Banks

Notice of decision: 14/09/2017

Anticipated restriction: Open


13/09/2017 - Adoption of the Kingsland neighbuohood development plan and consequential updates to the countywide policies map

To make the Kingsland neighbourhood development plan as part of the statutory development plan for Herefordshire and approve the consequential updates to the countywide policies map.

Decision Maker: Cabinet member infrastructure

Decision due date: 10/2017

Wards affected: Bircher;

Lead officer: Samantha Banks

Notice of decision: 13/09/2017

Anticipated restriction: Open


13/09/2017 - Adoption of the Belmont Rural neighbourhood development plan and cosequential updates to the countywide policies map

To make the Belmont Rural neighbourhood development plan as part of the statutory development plan for Herefordshire and approve the consequential updates to the countywide policies map.

Decision Maker: Cabinet member infrastructure

Decision due date: 10/2017

Wards affected: Belmont Rural;

Lead officer: Samantha Banks

Notice of decision: 13/09/2017

Anticipated restriction: Open


13/09/2017 - Community Learning Disability Service

To approve a 3 month waiver to allow a smooth transition of contract to the CCG to deliver the service.

Decision Maker: Cabinet member health and wellbeing

Decision due date: 16/10/2017

Wards affected: (All Wards);

Lead officer: Laura Tyler

Notice of decision: 13/09/2017

Anticipated restriction: Open


13/09/2017 - Herefordshire Safeguarding Adult Board Annual Report 2016/17

To report on the annual report of the Herefordshire Safeguarding Adult Board (HSAB), which addresses the work of multi-agency partners in Herefordshire in safeguarding and promoting the welfare of adults at risk within the county, including achievements and areas for improvement, and priorities identified for 2017/18. In addition to ensure cabinet are aware of the work of the board and future priorities, and have the opportunity to ensure the compatibility of any future council activity with those ongoing priorities

Decision Maker: Cabinet

Decision due date: 16/11/2017

Wards affected: (All Wards);

Lead officer: Bill Joyce

Notice of decision: 13/09/2017

Anticipated restriction: Open


12/09/2017 - Adoption of the Kings Caple neighbourhood development plan and consequential updates to the countywide policies map

To make the Kings Caple neighbourhood development plan as part of the statutory development plan for Herefordshire and approve the consequential updates to the countywide policies map.

Decision Maker: Cabinet member infrastructure

Decision due date: 10/2017

Wards affected: Old Gore;

Lead officer: Samantha Banks

Notice of decision: 12/09/2017

Anticipated restriction: Open


12/09/2017 - To approve completion of contractual arrangements for the development and regeneration programme and mobilisation of the partnership.

To approve completion of contractual arrangements for the development and regeneration programme and mobilisation of the partnership.

Decision Maker: Cabinet

Decision due date: 12/10/2017

Wards affected: (All Wards);

Lead officer: Robert Ewing

Notice of decision: 12/09/2017

Anticipated restriction: Open


08/09/2017 - Accounting policy update

To agree a change to the council’s accounting policy in the 2016/17 financial statements in relation to the pension deficit included therein.

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Andrew Lovegrove

Notice of decision: 08/09/2017

Anticipated restriction: Open


08/09/2017 - Unified Threat Management Solution Contract Award

To approve the recommendation to award a contract for the supply of unified threat management solution for Herefordshire Council, following a competitive tender process, for a 5 year period.

Decision Maker: Director for economy, communities and corporate

Decision due date: 26/09/2017

Wards affected: (All Wards);

Lead officer: Alicia Dunsby, Rosalie Schultz

Notice of decision: 08/09/2017

Anticipated restriction: Open


07/09/2017 - End of September corporate budget and performance report 2017/18

To consider performance for the first 6 months of 2017/18 and the projected budget outturn for the year

Decision Maker: Cabinet

Decision due date: 16/11/2017

Wards affected: (All Wards);

Lead officer: Steve Hodges

Notice of decision: 07/09/2017

Anticipated restriction: Open


06/09/2017 - Setting the 2018/19 budget and updating the medium term financial strategy

To seek the views of the general overview and scrutiny committee on the draft medium term financial strategy (MTFS) 2018-20 and the budget proposals for 2018-19.

 

Decision Maker: Council

Decision due date: 26/01/2018

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 06/09/2017

Anticipated restriction: Open


06/09/2017 - Audit findings report 2016/17

To update the committee on the external audit findings on the 2016/17 statement of accounts

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 06/09/2017

Anticipated restriction: Open


05/09/2017 - Update on debt collection

This report updates the committee on the debt collection arrangements between the council and Hoople Ltd.

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 05/09/2017

Anticipated restriction: Open


01/09/2017 - Commissioning of lifestyle services

To approve a framework setting out the council's approach to commissioning lifestyle services

Decision Maker: Cabinet member health and wellbeing

Decision due date: 15/11/2017

Wards affected: (All Wards);

Lead officer: Gwenda Ellison

Notice of decision: 01/09/2017

Anticipated restriction: Open


01/09/2017 - Herefordshire Safeguarding Children Board (HSCB) Annual Report 2016/17

To report on the annual report of the Herefordshire Safeguarding Children Board (HSCB), which addresses the work of multi-agency partners in Herefordshire in safeguarding and promoting the welfare of children and young people within the county, including achievements and areas for improvement, and priorities identified for 2017/19.

To ensure cabinet are aware of the work of the board and future priorities, and have the opportunity to ensure the compatibility of any future council activity with those ongoing priorities

Decision Maker: Cabinet

Decision due date: 16/11/2017

Wards affected: (All Wards);

Lead officer: Chris Baird

Notice of decision: 01/09/2017

Anticipated restriction: Open


01/09/2017 - Appointment of councils external auditors

This report updates the committee on the outcome of the Public Sector Audit Appointments Limited (PSAA) procurement of external auditors for audits of the accounts from 2018/19.

Herefordshire Council has opted into the PSAA auditor appointment arrangements which proposes appointing Grant Thornton as the external auditor of Herefordshire Council.

Decision Maker: Council

Decision due date: 13/10/2017

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 01/09/2017

Anticipated restriction: Open


31/08/2017 - Contract management and quality of services

To consider the approach to contract management, with a particular focus on provider quality assurance and resilience in order to identify any recommendations for the service to consider

Decision Maker: Adults and wellbeing scrutiny committee

Decision due date: 21/09/2017

Wards affected: (All Wards);

Lead officer: Amy Pitt

Notice of decision: 31/08/2017

Anticipated restriction: Open


31/08/2017 - Capital contribution towards new hall at Kimbolton, St James CE Primary School

To approve the proposed expenditure of Basic Need funding as a contribution towards the provision of a new school hall at Kimbolton St James CE Primary School

Decision Maker: Director for children's wellbeing

Decision due date: 29/09/2017

Wards affected: Leominster North & Rural;

Lead officer: Karen Knight

Notice of decision: 31/08/2017

Anticipated restriction: Open


31/08/2017 - re-commissioning accommodation based support for young people

15 units of accommodation based support with a specific focus on care leavers and those who meet Local Authority thresholds.

Decision Maker: Cabinet member finance, housing and ICT

Decision due date: 08/11/2017

Wards affected: (All Wards);

Lead officer: Ewen Archibald

Notice of decision: 31/08/2017

Anticipated restriction: Open


29/08/2017 - Outcome of peer review June 2017

To consider the outcomes of and recommendations from the peer review of children's social casework and to consider if the outcomes provide assurance to the committee.

Decision Maker: Children and young people scrutiny committee

Decision due date: 02/10/2017

Wards affected: (All Wards);

Lead officer: Chris Baird

Notice of decision: 29/08/2017

Anticipated restriction: Open


29/08/2017 - Children's Wellbeing Self Assessment 2017

To consider if the children's wellbeing self assessment provides the necessary assurance for the committee. In addition to agree any comments and recommendations.

Decision Maker: Children and young people scrutiny committee

Decision due date: 02/10/2017

Wards affected: (All Wards);

Lead officer: Adam Scott

Notice of decision: 29/08/2017

Anticipated restriction: Open


29/08/2017 - Charity Shop Waste Disposal

To approve changes to the service which permits charity shops to dispose of their waste free of charge at Herefordshire Council’s waste transfer stations.

Decision Maker: Cabinet member contracts and assets

Decision due date: 28/09/2017

Wards affected: (All Wards);

Lead officer: Kenton Vigus

Notice of decision: 29/08/2017

Anticipated restriction: Open


29/08/2017 - Substance Misuse Service Performance Update

To seek the view of scrutiny committee in relation to the substance misuse service performance.

Decision Maker: Adults and wellbeing scrutiny committee

Decision due date: 21/09/2017

Wards affected: (All Wards);

Lead officer: Kayte Thompson-Dixon

Notice of decision: 29/08/2017

Anticipated restriction: Open


25/08/2017 - Local Flood Risk Management Strategy

To approve the Herefordshire local flood risk management strategy.

Decision Maker: Cabinet

Decision due date: 28/09/2017

Wards affected: (All Wards);

Lead officer: Steve Hodges

Notice of decision: 18/09/2017

This decision will be taken under urgency procedures.

Reason for urgency:
Herefordshire Council, as Lead Local Flood Authority for the county has a statutory duty to develop, maintain, apply and monitor a Strategy for local flood risk management in its area. The deadline for finalising the strategy is 31 October 2017 and if this is not achieved, there is a risk that government will instruct another risk management authority to carry out our role in relation to the strategy and to recover the costs for this work from us.

This item was published as a non-key decision on 25 August 2017. It has now been determined that this decision should be a key decision. Government have previously been informed that the strategy would be considered by cabinet on 28 September 2017 and it is necessary to adhere to this date in order to meet the deadline for finalising the strategy.

The Chairman of the relevant scrutiny committee has been informed of the matter.

Anticipated restriction: Open


24/08/2017 - Transfer of land for regeneration

To seek approval to re-allocate council owned land, at Waterworks Lane, Leominster to Stonewater Housing Association in order to deliver self-build affordable housing for veterans.

Decision Maker: Director for economy, communities and corporate

Decision due date: 18/09/2017

Wards affected: Leominster East;

Lead officer: Tina Wood

Notice of decision: 24/08/2017

Anticipated restriction: Open


24/08/2017 - Pre-Paid Cards Tender

To approve a tender process for pre-paid cards with a revised specification

Decision Maker: Cabinet

Decision due date: 18/01/2018

Wards affected: (All Wards);

Lead officer: Laura Ferguson

Notice of decision: 24/08/2017

Anticipated restriction: Open


24/08/2017 - Extension and variation of housing related support contracts

To approve the extension of contracts for accommodation based and floating support and variation of floating support contract

Decision Maker: Cabinet member finance, housing and ICT

Decision due date: 25/10/2017

Wards affected: (All Wards);

Lead officer: Ewen Archibald

Notice of decision: 24/08/2017

Anticipated restriction: Open


24/08/2017 - Joint municipal waste management strategy review

To update the joint municipal waste management strategy (JMWMS) for Herefordshire and Worcestershire

Decision Maker: Cabinet member contracts and assets

Decision due date: 28/09/2017

Wards affected: (All Wards);

Lead officer: Kenton Vigus

Notice of decision: 24/08/2017

Anticipated restriction: Open


23/08/2017 - City Link Road, Widemarsh Street, Station Approach, Hopton Road and Barrs Court Road, Hereford - various orders proposals

To authorize the formal advertising of various right turn, waiting and one-way restrictions in the Wards above as part of the Hereford City Link Road (ESG) scheme

Decision Maker: Assistant director environment and place

Decision due date: 07/09/2017

Wards affected: Central; College; Widemarsh;

Lead officer: Mairead Lane

Notice of decision: 23/08/2017

Anticipated restriction: Open


22/08/2017 - Response to the LGA Peer Review of Museums, Libraries and Archives

To consider the recommendations of the Peer Review conducted by the LGA with associated action plan and linked strategies.

Decision Maker: Cabinet member contracts and assets

Decision due date: 26/10/2017

Wards affected: (All Wards);

Lead officer: Natalia Silver

Notice of decision: 22/08/2017

Anticipated restriction: Open


18/08/2017 - Honouring the Canary Girls

In March, full Council recognised the significant contribution made during the First and Second World Wars by the ‘canary girls’ in the munitions factories in Rotherwas and asked the executive to consider erecting a plaque in Rotherwas to recognise their national role and sacrifices made in the war effort and to honour and remember their important work in the county.  This report responds to that request.

Decision Maker: Cabinet member contracts and assets

Decision due date: 02/10/2017

Wards affected: (All Wards);

Notice of decision: 18/08/2017

Anticipated restriction: Open


18/08/2017 - National school funding formula

to inform schools forum of the governments proposals for the national school funding formula and to outline the choices and options proposed by the Budget Working Group for implementing from April 2018 subject to consultation with schools

Decision Maker: Herefordshire schools forum

Decision due date: 20/10/2017

Wards affected: (All Wards);

Lead officer: Malcolm Green

Notice of decision: 18/08/2017

Anticipated restriction: Open


18/08/2017 - Passenger Transport Services - Dynamic Purchasing System

To seek approval to establish a new dynamic purchasing system for the procurement of all passenger transport service and replace existing frameworks.

Decision Maker: Cabinet

Decision due date: 12/10/2017

Wards affected: (All Wards);

Lead officer: Steve Burgess

Notice of decision: 18/08/2017

Anticipated restriction: Open


18/08/2017 - Internal audit report re project management of the joint customer services hub (Blueschool House) capital project.

To enable the committee to update the committee on the outcome of the investigation by SWAP to consider the findings of an internal audit report on the project management of the refurbishment of Blueschool House and the main issues arising and to provide assurance that action has been taken where necessary.

Following an identified and unauthorised overspend on the capital project to refurbish Blueschool House to provide a joint customer services hub, as reported to the May 2017 Audit and Governance Committee the section 151 officer requested internal audit to investigate the circumstances which led to the overspend and identify any improvements to processes and procedures in order to maintain effective financial controls and ensure value for money. Cabinet received a report on the expenditure and revised business case in July 2017, approved a new financial package, and requested that audit and governance committee identify and recommend improvement actions to strengthen property capital project management and control.
into the Blueschool Refurbishment

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Andrew Lovegrove

Notice of decision: 18/08/2017

Anticipated restriction: Open


18/08/2017 - Proposed changes to the council tax reduction scheme

To seek the views of the general scrutiny committee on the proposed changes to the current council tax reduction scheme (CTR)

Decision Maker: General scrutiny committee

Decision due date: 13/11/2017

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 18/08/2017

Anticipated restriction: Open


17/08/2017 - Progress report on 2017/18 internal audit plan

To update members on the progress of internal audit work and to bring to their attention any key internal control issues arising from work recently completed.

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Andrew Lovegrove

Notice of decision: 17/08/2017

Anticipated restriction: Open


15/08/2017 - Bromyard Childrens Centre Services

To agree if a re-commissioning / tender exercise is required or if the services provided should be brought in house following the current consultation that is due for completion 30 September 2017.

Decision Maker: Cabinet

Decision due date: 16/11/2017

Wards affected: Bromyard West;

Lead officer: Julia Stephens

Notice of decision: 15/08/2017

Anticipated restriction: Open


11/08/2017 - Community Services Programme – Public Engagement

This purpose of this report is to provide the Committee with information relating to the intentions of Herefordshire Clinical Commissioning Group to undertake a county-wide public engagement programme relating to community health provision. The Committee is asked to note the engagement progress so far and review the plans for further stages.

Decision Maker: Adults and wellbeing scrutiny committee

Decision due date: 23/08/2017

Wards affected: (All Wards);

Lead officer: Martin Samuels

Notice of decision: 11/08/2017

Anticipated restriction: Open


11/08/2017 - Community Governance Review

To agree that Herefordshire Council undertakes a series of targeted Community Governance Reviews and to agree the draft terms of reference for such a review.

Decision Maker: Council

Decision due date: 13/10/2017

Wards affected: (All Wards);

Lead officer: John Coleman

Notice of decision: 11/08/2017

Anticipated restriction: Open


10/08/2017 - Option for extension for the provision of the Integrated Community Equipment Store (ICES)

To approve and initiate the option for a one year contract extension for the provision of the Integrated Community Equipment Store (ICES).

Decision Maker: Cabinet member health and wellbeing

Decision due date: 07/11/2017

Wards affected: (All Wards);

Lead officer: Amy Pitt

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Allocation for additional funding for adult social care

To approve the detailed allocation of the additional funding for adult social care

Decision Maker: Director for adults and wellbeing

Decision due date: 02/10/2017

Wards affected: (All Wards);

Lead officer: Amy Pitt

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - New nomination agreements with multiple housing providers

To approve nomination arrangements for the allocation of social and affordable rented housing ensuring that the council's statutory duties are met by the housing providers

Decision Maker: Director for adults and wellbeing

Decision due date: 06/12/2017

Wards affected: (All Wards);

Lead officer: Trea Connon

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Proposed redesign of Technology Enabled Care Services (TECS)

To approve the proposed redesign of Technology Enabled Care Services (TECS)

Decision Maker: Cabinet member health and wellbeing

Decision due date: 06/10/2017

Wards affected: (All Wards);

Lead officer: Amy Pitt

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Recommissioning of services to support WISH

To approve the commissioning plan for services to support the WISH website for implementation in 2018

Decision Maker: Cabinet member health and wellbeing

Decision due date: 08/11/2017

Wards affected: (All Wards);

Lead officer: Danielle Mussell

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Redesign and procurement of a countywide Shared Lives Scheme

To approve the redesign and procurement of a countywide Shared Lives Scheme

Decision Maker: Cabinet member health and wellbeing

Decision due date: 31/10/2017

Wards affected: (All Wards);

Lead officer: Ian Gardner

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Herefordshire's BCF and Integration Plan 2017-2019

To approve Herefordshire's BCF and Integration Plan 2017-2019

Decision Maker: Health and wellbeing board

Decision due date: 07/09/2017

Wards affected: (All Wards);

Lead officer: Emma Evans

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Childrens rights advocacy and independent visitor services

To approve the commissioning intentions for children's rights and advocacy services and the independent visitor service

Decision Maker: Director for children's wellbeing

Decision due date: 05/01/2018

Wards affected: (All Wards);

Lead officer: Sandra Griffiths

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Speech and language therapy for young people

To approve the speech and language therapy arrangement up to 31st March 2018

Decision Maker: Director for children's wellbeing

Decision due date: 29/09/2017

Wards affected: (All Wards);

Lead officer: Frankie Green, Richard Watson

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Childrens social care emergency duty arrangements

To approve the children's social care out of hours emergency duty arrangements for the period up to 31st March 2020

Decision Maker: Cabinet member young people and children's wellbeing

Decision due date: 29/09/2017

Wards affected: (All Wards);

Lead officer: Frankie Green, Richard Watson

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Proposed redesign of the Allocations system for Herefordshire including revised Allocations Policy

To approve the proposed redesign of the allocations system for Herefordshire and seek approval of the revised allocations policy

Decision Maker: Cabinet

Decision due date: 16/11/2017

Wards affected: (All Wards);

Lead officer: Ewen Archibald

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - The introduction of an open approved list for the delivery of home care services (Care @ Home)

To agree revised arrangements for the provision of commissioned home care services.

Decision Maker: Cabinet

Decision due date: 28/09/2017

Wards affected: (All Wards);

Lead officer: Ian Gardner

Notice of decision: 10/08/2017

Anticipated restriction: Open


10/08/2017 - Services commissioned from Wye Valley NHS Trust – quality and sustainability

To review the quality and sustainability of services commissioned by the Herefordshire Clinical Commissioning Group (CCG) from Wye Valley NHS Trust on behalf of the population of Herefordshire.

The information in this report which has provided by the CCG and Wye Valley NHS Trust, has previously been shared in public through the public meetings of the CCG’s Governing Body and the Trust’s Board.

Decision Maker: Adults and wellbeing scrutiny committee

Decision due date: 23/08/2017

Wards affected: (All Wards);

Lead officer: Martin Samuels

Notice of decision: 10/08/2017

Anticipated restriction: Open


09/08/2017 - Autism Strategy

To approve updated Autism Strategy 2018-2021

Decision Maker: Cabinet

Decision due date: 14/12/2017

Wards affected: (All Wards);

Lead officer: John Gorman

Notice of decision: 09/08/2017

Anticipated restriction: Open


09/08/2017 - Internal audit annual report and opinion 2016/17

The purpose of this report is to provide a summary of the internal audit work undertaken in 2016/17 and the overall internal audit opinion based on this work.

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 09/08/2017

Anticipated restriction: Open


08/08/2017 - Rights of Way Improvement Plan 2017-2027

To adopt and endorse the revised statutory Rights of Way Improvement Plan 2017-227

Decision Maker: Cabinet member transport and roads

Decision due date: 16/11/2017

Wards affected: (All Wards);

Lead officer: Steve Burgess

Notice of decision: 08/08/2017

Anticipated restriction: Open


08/08/2017 - Variation to floating support contract

Mid-term contract variation to the housing related floating support service

Decision Maker: Cabinet member finance, housing and ICT

Decision due date: 06/09/2017

Wards affected: (All Wards);

Lead officer: Christa Jackson

Notice of decision: 08/08/2017

Anticipated restriction: Open


08/08/2017 - Reprocurement of Housing IT services

To approve a procurement process for IT systems supporting housing allocations and other functions

Decision Maker: Cabinet member finance, housing and ICT

Decision due date: 10/2017

Wards affected: (All Wards);

Lead officer: Trea Connon

Notice of decision: 08/08/2017

Anticipated restriction: Open


07/08/2017 - Introduction of local controls regarding the release of sky lanterns and helium ballons

To consider the executive response to the motion to Council seeking restriction on the use of sky lanterns and to introduce local controls regarding the use of sky lanterns at Council run events, private events that are undertaken on Council owned or leased land. To seek to use a model licensing condition, for applicants to offer on their application or members to apply when applications come before them, as a way to curtail the use of sky lanterns on private sites i.e licensed wedding venues and licensed premises.

Decision Maker: Cabinet member economy and corporate services

Decision due date: 19/10/2017

Wards affected: (All Wards);

Lead officer: Marc Willimont

Notice of decision: 07/08/2017

Anticipated restriction: Open


04/08/2017 - Potential data breach - record of officer decision

To advise the committee on the circumstances behind a wrongly published decision notice

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Erica Hermon

Notice of decision: 04/08/2017

Anticipated restriction: Open


03/08/2017 - Renewal of family befriending and mentoring service provision to 31st March 2018

To approve the renewal of Herefordshire’s family mentoring services to 31st March 2018.

Decision Maker: Director for children's wellbeing

Decision due date: 25/08/2017

Wards affected: (All Wards);

Lead officer: Frankie Green

Notice of decision: 03/08/2017

Anticipated restriction: Open


03/08/2017 - Signing of 2016/17 statement of accounts

To seek the audit and governance committee’s approval of the 2016/17 statement of accounts

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 03/08/2017

Anticipated restriction: Open


03/08/2017 - The rescheduling of debt repayment costs

To advise of the proposed debt rescheduling methodology

Decision Maker: Council

Decision due date: 13/10/2017

Wards affected: (All Wards);

Lead officer: Josie Rushgrove

Notice of decision: 03/08/2017

Anticipated restriction: Open


03/08/2017 - Extension of regional residential childrens home framework agreement

To approve the renewal of the contract for the West Midlands residential framework for a period of one year up to December 2018.

Decision Maker: Director for children's wellbeing

Decision due date: 19/09/2017

Wards affected: (All Wards);

Lead officer: Sandra Griffiths

Notice of decision: 03/08/2017

Anticipated restriction: Open


03/08/2017 - Nursery education funding agreement 2017

To approve the Herefordshire nursery education funding agreement that is based upon the model agreement that the Department for education has advised all local authorities to adopt.

Decision Maker: Cabinet

Decision due date: 26/10/2017

Wards affected: (All Wards);

Lead officer: Julia Stephens

Notice of decision: 03/08/2017

Anticipated restriction: Open


31/07/2017 - Herefordshire weight management tier 2 pilot

To approve the design and implementation of tier 2 weight management pilot

Decision Maker: Director for adults and wellbeing

Decision due date: 30/08/2017

Wards affected: (All Wards);

Lead officer: Gwenda Ellison

Notice of decision: 31/07/2017

Anticipated restriction: Open


31/07/2017 - Allocation of 2 year Nursery Education Fund spend

To agree the commissioning approach for the 2 year nursery education fund spend, following on from the presentation to Schools Forum on the Early Years Summary Report and recommendations on 21st October 2016. Schools forum agreed in principle, the recommendations to use the £890,000 (2 year underspend) on the following three service areas.

1. Proposal to commission a targeted speech and language support for 0-5 years = £590k over 2/3 years.
.
2. Proposal that £200,000 is assigned for the delivery of training /conferences to early years practitioners & parents around specific identified gaps e.g. Literacy, Phonics, Numeracy, parenting.

3. Proposal that up to a total of £100,000 To be spent on supporting infant mental health through implementing The Solihull Approach to early years professionals across the county to include; Midwifes, Early Years Workers, Family Support Workers, parents (70k). To also support extended training to midwifes and family support workers on a specific birth Trauma training methodology (30k).

Decision Maker: Cabinet member young people and children's wellbeing

Decision due date: 12/09/2017

Wards affected: (All Wards);

Lead officer: Julia Stephens

Notice of decision: 31/07/2017

Anticipated restriction: Open


31/07/2017 - Commissioning intentions for universal and early help services for children, young people and families

To approve the commissioning intentions for services as part of Herefordshire’s approach to supporting families and providing early help for children and young people aged 0-19, (and up to age 25 for young people with a disability and/or additional health needs). This involves public health nursing, children’s centres services in Bromyard, and family befriending and mentoring services from April 2018.

Decision Maker: Cabinet, Children and young people scrutiny committee

Wards affected: (All Wards);

Lead officer: Lindsay MacHardy

Notice of decision: 17/07/2017

Anticipated restriction: Open


31/07/2017 - Continued resourcing for legal disputes

To approve the additional allocation of resources required to meet ongoing demands placed upon the council resulting from the need to effectively respond to a legal dispute, over and above that already agreed.

Decision Maker: Cabinet member economy and corporate services

Decision due date: 10/2017

Wards affected: (All Wards);

Lead officer: Erica Hermon

Notice of decision: 31/07/2017

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The appendix to this report is exempt by virtue of paragraph 5 ‘information in respect of which a claim to legal professional privilege could be maintained in legal proceedings’ of the access to information procedure rules set out in the constitution pursuant to schedule 12A Local Government Act 1972, as amended.


28/07/2017 - Delivery of legal services

To review delivery of legal support to children's wellbeing

Decision Maker: Cabinet

Decision due date: 01/12/2017

Wards affected: (All Wards);

Lead officer: Erica Hermon

Notice of decision: 28/07/2017

Anticipated restriction: Open


27/07/2017 - Town Hall terracotta and stone work repair, including canopy and building facade

To approve request to go out to develop the scheme and go out to tender for the works to repair the Town Hall front facade and the front porch.

Decision Maker: Chief finance officer

Decision due date: 25/08/2017

Wards affected: Central;

Lead officer: Gary Angove

Notice of decision: 27/07/2017

Anticipated restriction: Open


27/07/2017 - Community Commissioning Model for Public Realm Services

To seek approval of the community commissioning model, an approach that enables communities to procure various public realm services through the council’s service provider(s).

Decision Maker: Cabinet member transport and roads

Decision due date: 21/09/2017

Wards affected: (All Wards);

Lead officer: Laura Lloyd

Notice of decision: 27/07/2017

Anticipated restriction: Open


27/07/2017 - Lease of council premises to Wye Valley NHS Trust

Proposed lease of former archive store, Harold Street, Hereford to Wye Valley NHS Trust (WVT) and co-location of WVT back office functions to Plough Lane

Decision Maker: Cabinet

Decision due date: 12/10/2017

Wards affected: Central; Widemarsh;

Lead officer: Andrew Husband

Notice of decision: 27/07/2017

Anticipated restriction: Open


26/07/2017 - Annual report on code of conduct complaints

To update the committee on code of conduct complaints during 2016/17

Decision Maker: Audit and governance committee

Decision due date: 20/09/2017

Wards affected: (All Wards);

Lead officer: Caroline Marshall, Claire Ward

Notice of decision: 26/07/2017

Anticipated restriction: Open


25/07/2017 - Leader's report to council

To receive a report from the leader on the activities of the executive (cabinet) since the meeting of Council in July 2017.

Decision Maker: Council

Decision due date: 13/10/2017

Wards affected: (All Wards);

Lead officer: Annie Brookes

Notice of decision: 25/07/2017

Anticipated restriction: Open


24/07/2017 - Trade Union Facilities

To review the new arrangements for trade union facilities and to agree to consult schools on a revised amount per pupil for de-delegation from April 2018.

Decision Maker: Herefordshire schools forum

Decision due date: 20/10/2017

Wards affected: (All Wards);

Lead officer: Julie Davies

Notice of decision: 24/07/2017

Anticipated restriction: Open


04/07/2017 - Care at home - open framework for home care services

Decision Maker: Cabinet

Decision due date: Not before 12/10/2017

Lead officer: Ian Gardner

Notice of decision: 04/07/2017


26/06/2017 - Marches Investment Fund

Decision Maker: LEP Director

Decision due date: 31/07/2017

Notice of decision: 26/06/2017


26/06/2017 - Marches Investment Fund

Decision Maker: LEP Director

Decision due date: 31/07/2017

Notice of decision: 26/06/2017


26/06/2017 - Marches Investment Fund

Decision Maker: LEP Director

Decision due date: 31/07/2017

Notice of decision: 26/06/2017


22/06/2017 - HCCTP ACTIVE TRAVEL MEASURES

Decision Maker: Cabinet

Decision due date: 15/03/2018

Notice of decision: 22/06/2017


22/06/2017 - HEREFORD CITY CENTRE IMPROVEMENTS - ST OWENS STREET

Decision Maker: Cabinet member transport and roads

Decision due date: 26/10/2017

Lead officer: Mairead Lane

Notice of decision: 22/06/2017


22/06/2017 - HTP OPTIONS CONSULTATION & PHASE 2

Decision Maker: Cabinet member infrastructure

Decision due date: 12/10/2017

Lead officer: Mairead Lane

Notice of decision: 22/06/2017


12/04/2017 - HEREFORDSHIRE INTENSIVE PLACEMENT SUPPORT SERVICE (HIPSS) AND THERAPEUTIC INTERVENTION SUPPORT SERVICE (TISS)

To approve a procurement exercise for the provision of the Herefordshire intensive placement support service (HIPSS) and therapeutic intervention support service (TISS). 

 

Decision Maker: Cabinet

Decision due date: 28/09/2017

Wards affected: (All Wards);

Lead officer: Chris Jones

Notice of decision: 25/08/2017

Anticipated restriction: Open


06/04/2017 - PROPOSAL TO REPLACE EXISTING ENTERPRISE ZONE STATUTORY BUSINESS RATE RELIEF WITH DISCRETIONARY RELIEF FOR NEW BUSINESSES ON HEREFORD ENTERPRISE ZONE

Decision Maker: Cabinet member contracts and assets

Decision due date: 23/05/2017

Notice of decision: 06/04/2017


14/03/2017 - Devolution

Decision Maker: Cabinet

Decision due date: Not before 04/05/2017

Lead officer: vabesamis

Notice of decision: 14/03/2017


03/02/2017 - South Wye Transport Package Active Travel Measure Programme

Decision Maker: Cabinet member infrastructure

Decision due date: 17/03/2017

Lead officer: Mairead Lane

Notice of decision: 03/02/2017


13/01/2017 - Hereford City Centre Order 2016

Decision Maker: Cabinet member transport and roads

Decision due date: Not before 30/03/2017

Lead officer: Mairead Lane

Notice of decision: 13/01/2017


11/01/2017 - Proposed Redesign of the Allocations System for Herefordshire

Decision Maker: Cabinet

Decision due date: Not before 11/05/2017

Lead officer: Ewen Archibald

Notice of decision: 11/01/2017


25/10/2016 - Marches Draft Strategic Economic Plan Refresh

Decision Maker: Marches Enterprise Joint Committee

Decision due date: Not before 01/03/2017

Notice of decision: 25/10/2016


05/08/2016 - HEREFORD TRANSPORT PACKAGE (HEREFORD BYPASS) CONSULTATION

Decision Maker: Cabinet member infrastructure

Decision due date: 20/10/2016

Lead officer: Mairead Lane

Notice of decision: 05/08/2016