Decision details
Minerals & Waste Local Plan (MWLP) Consultation
Decision Maker: Cabinet member Infrastructure and transport
Decision status: Recommendations Approved
Is Key decision?: Yes
Is subject to call in?: Yes
Purpose:
To approve the draft MWLP development plan document (appendices A to C) for pre-submission publication, in accordance with regulation 19 of the Town and Country Planning (Local Planning) (England) Regulations 2012 (as amended).
Decision:
That: a) the draft MWLP development plan document be approved for pre-submission consultation; b) authority be delegated to the Assistant Director for Regulation, Environment and Waste, following consultation with the Cabinet Member Infrastructure and Transport, to make any minor technical, textual or graphical amendments required to the draft MWLP and supporting documents, before pre-submission consultation begins; and c) authority be delegated to the Assistant Director for Regulation, Environment and Waste, following consultation with the Cabinet Member Infrastructure and Transport, to make any minor technical, textual or graphical amendments required to the draft MWLP and supporting documents, after the pre-submission consultation and prior to approval being sought from Council for submission of the MWLP to the Secretary of State for independent examination.
|
Alternative options considered:
1. Not to progress the MWLP would leave the council in a position where the extant Unitary Development Plan policies are out of date. This would be contrary to the recommendation of the Core Strategy's inspector, who stated that a separate MWLP should be prepared in accordance with the local development scheme. When adopted, this will form part of the Herefordshire Local Plan.
2. Not to delegate authority to make necessary and minor amendments is not recommended because it would be impracticable to await a further meeting with the Cabinet Member to address such matters.
Reason Key: Strategic nature / impact on communities;
Wards Affected: (All Wards);
Details of any declarations of interest: None
Consultees
GSC: 28 September 2020
Cabinet Feeder: 12th November 2020
Cabinet: 1st December 2020 (including political groups
consultation)
All comments from these meetings were addressed and consequently
alterations to the MWLP were made - see report.
Contact: Victoria Eaton, Senior planning officer Email: veaton@herefordshire.gov.uk Tel: 01432 260146.
Publication date: 05/03/2021
Date of decision: 05/03/2021
Effective from: 12/03/2021
Accompanying Documents:
- Minerals & Waste Local Plan (MWLP) Consultation, main report PDF 448 KB
- Appendix A: Publication draft MWLP (January 2021) PDF 2 MB
- Appendix B: Publication draft MWLP Annex A (January 2021) PDF 4 MB
- Appendix C: Publication draft MWLP Allocated Sites Appendix (January 2021) PDF 9 MB
- Appendix D: Supplementary Sites Report (March 2020 & updated) PDF 1 MB
- Appendix E: Supplementary Sites Report Annex (March 2020) PDF 2 MB
- Appendix F: Minerals Needs Assessment 2019 (March 2020) PDF 1 MB
- Appendix G: Minerals Needs Assessment Annex 2019 (March 2020) PDF 2 MB
- Appendix H: Waste Needs Assessment 2019 (March 2020) PDF 3 MB
- Appendix I: Waste Needs Assessment Annex 2019 (March 2020) PDF 4 MB
- Appendix J: Publication Draft MWLP Overview (December 2020) PDF 234 KB
- Appendix K: Habitats Regulation Assessment (January 2021) PDF 2 MB
- Appendix L: Sustainability Appraisal Non-Technical Summary (January 2021) PDF 898 KB
- Appendix M: Changes to Publication draft MWLP post GSC (November 2020) PDF 191 KB
- Appendix N: Changes to Publication draft MWLP post Cabinet (December 2020) PDF 72 KB
- Appendix O: Changes to Publication draft MWLP January 2021 PDF 90 KB