20/04/2022 - Herefordshire Natural Flood Management (NFM) Project ref: 8758 Recommendations Approved
To accept and authorise the spend of the Flood defence grant in aid and Local Regional Flood Risk Management Committee funding offered by the Environment Agency up to £1,273,600 in support of the proposed Natural Flood Management project ( “NFM Project”) and to approve the commencement of the procurement of Catchment Advisor services to support the project.
Decision Maker: Cabinet member Infrastructure and transport
Decision published: 20/04/2022
Effective from: 27/04/2022
Decision:
THAT:
a) The funding of £1,273,600 offered by the Environment Agency be accepted and expenditure of the funding in support of the proposed NFM Project across the 5 year period up until 31 March 2027 be authorised;
b) All operational decisions and spend of the £1,273,600 funding in accordance with the Business Case (Annex 1) be delegated to the Interim Service Director Environment, Highways and Waste, in consultation with the Cabinet member for Infrastructure and transport; and
c) The commencement of the procurement of Catchment Advisor services to support the project be approved and all operational decisions be delegated to the Interim Service Director Environment, Highways and Waste.
Wards affected: (All Wards);
Lead officer: Steve Hodges
24/03/2022 - To approve spend for Safer Streets 3 Project ref: 8685 Recommendations Approved
To approve spend of up to £283,908 on the Safer Streets 3 Project, which is being delivered in conjunction with The Police and Crime Commissioner for West Mercia, who have been awarded a grant from the Home Office to deliver this project.
Decision Maker: Corporate Director – Economy & Environment
Decision published: 24/03/2022
Effective from: 31/03/2022
Decision:
That:
a) The Safer Streets 3 Project grant of £249,253 be accepted from the West Mercia Police and Crime Commissioner;
b) The match funding of £6,511 be accepted from the stronger towns fund as per the agreement between the council and the Wyeside River Project;
c) Expenditure of up to £283,908 be approved for the improvements set out in paragraph 3 of this report;
d) The Interim Service Director for Economy and Regulatory Services is authorised, in consultation with the Corporate Director - Economy & Environment and the council’s Section 151 officer to take all operational decisions relating to the above recommendations.
Wards affected: Aylestone Hill; Central; College; Dinedor Hill; Greyfriars; Hinton and Hunderton; Newton Farm; Red Hill; Whitecross; Widemarsh;
Lead officer: Florence Churchill, Michael Griffin, Kirsty Sheehan, Neil Taylor
18/03/2022 - Property services estates capital programme 2022/25 and residual improvement works from the 2019 estates condition reports ref: 8667 Recommendations Approved
To agree the property services 2022/25 estates capital programme and the programme of residual improvement works from the 2019 estates condition reports.
The proposed programme of works as set out in appendix A and appendix B, incorporates a series of planned project works that enables the council to deliver on its obligations to maintain buildings fit for purpose utilising £4,398,561 capital budget subject to approval at council budget meeting of 11 February 2022.
Decision Maker: Cabinet member commissioning, procurement and assets
Decision published: 18/03/2022
Effective from: 25/03/2022
Decision:
That:
a) the estates capital programme 2022/25 as set out in appendix A and the programme of works for the residual improvement works from the 2019 estates condition reports as set out in appendix B be approved at a combined total cost of not more than £4,398,561;
b) the director for resources and assurance be authorised to take all operational decisions necessary to implement the above recommendation and spend within the approved overall budget of £3,007,000 for the projects as listed in appendix A, and £1,391,561 for projects listed in appendix B provided that the sum of individual project expenditure do not exceed the overall budgets;
c) the director for resources and assurance be authorised to realign uncommitted budget between projects listed in Appendix A and those listed in Appendix B and to take all operational decisions necessary to spend within the approved overall budget of £3,007,000 for projects in appendix A and £1,391,561 for projects in appendix B provided that the sum of expenditure does not exceed the overall budgets; and
d) the director for resources and assurance be authorised to take all operational decisions necessary to implement the expenditure of the Property Estates Enhancement Works-Emergency budget on emergency works as they arise.
Wards affected: (All Wards);
Lead officer: GianCarlo Paganuzzi
14/01/2022 - Disposal of a land parcel at Haugh Road, Hereford Enterprise Zone, Rotherwas ref: 8492 Recommendations Approved
Compliance with approved council policy.
To facilitate the growth of existing Herefordshire business.
Deliver private sector investment and job creation in the EZ which
will boost confidence and interest from others and help generate
further private sector investment and job creation.
Following the award of enterprise zone status in August 2011
approximately 45 hectares (110 acres) of council owned land was
included, along with other privately owned land, in the designated
EZ.
All the EZ land is being actively marketed, and is being sold
according to independent land valuations and the EZ Land Disposal
Policy which was approved by cabinet member on 7 January
2016.
Sustained progress has been achieved with well over 50 acres sold
to date.
The sale of the land is on a freehold basis. The purchaser will not
accept or proceed with the purchase on any other basis.
This sale has the full endorsement of the Hereford Enterprise Zone
Board.
The sale is to a local business who wishes to develop small scale
business units for rent.
The decision to sell this plot supports council policy to use
capital receipts from sale of land within the Enterprise Zone to
fund the capital expenditure on installing necessary infrastructure
across the site. The latest council decision to incur this
expenditure is available via this link:
http://councillors.herefordshire.gov.uk/ieDecisionDetails.aspx?ID=6182
Decision Maker: Corporate Director – Economy & Environment
Decision published: 14/01/2022
Effective from: 14/01/2022
Lead officer: Neil Taylor
14/01/2022 - To develop, deliver and commission the Microsoft Dynamics CRM replacement system currently used by the customer services team and associated forms on the Herefordshire Council website ref: 8491 Recommendations Approved
The current Microsoft Dynamics CRM 2011 system
was purchased and developed in 2011, which provides a basic system
for recording customer contact and logging requests for service.
Components of the current system used by the customer services team
and supports forms on the website are no longer supported by the
existing supplier which provides the associated risks:
It is no longer possible to develop the current solution to meet
our changed needs as the original supplier is no longer available
to carry out this work on our behalf.
Although the data is regularly back up it provides a risk
It has not been possible to capture data required to support the
Council’s response to Covid-19 such as volunteer contact
details, key support requirements for members of the public and
food ordering and delivery information.
This project will review the current functions and services
required for the future within the customer services team and
provide a system that will:
Give the customer a consistent and improved quality experience
regardless of the channel
Allow in-house development which will easily respond to changing
demands
Enable a combined view of the customer and activity across the
council’s departments and services – a
‘golden’ record
Provide monitoring and management of the contacts received from
start to completion
Enable the analysis of trends and demand so that the council can be
proactive in offering services and be more timely in their
delivery
Provide a portal for councillors to raise and track requests on
behalf of their constituents as well as access information.
To complement this work a customer service strategy will be
developed to consider the future customer services offer for
Herefordshire Council which will also scope the future integrations
required across all directorates to improve the customer
experience.
This proposal and recommendation will improve the system for the
customer and staff and at this stage will replace the existing
functions, further development and scoping is required for
integration across other service areas.
Decision Maker: Director of Resources and Assurance
Decision published: 14/01/2022
Effective from: 14/01/2022
Lead officer: Sandra Mehigan
14/01/2022 - Herefordshire Council Tenancy Strategy 2021 - 2024 ref: 8468 Recommendations Approved
To approve the tenancy strategy as a guiding document for Registered Providers working across Herefordshire. The tenancy strategy is a statutory document. The Localism Act 2011, sets out provisions for housing tenure reform and places a duty on local authorities to prepare and publish a tenancy strategy, to keep it under review and to modify or replace it from time to time. Our existing tenancy strategy was approved in 2016 as part of the revised housing allocation policy. A new housing allocations scheme was agreed and implemented in 2020, but this did not include a tenancy strategy. A new tenancy policy that reflects current legislation and up to date housing needs data is now required.
Decision Maker: Cabinet Member housing, regulatory services and community
Decision published: 14/01/2022
Effective from: 21/01/2022
Decision:
That:
a) That the tenancy strategy at appendix 1 to the report is approved as a guiding document for registered providers working across Herefordshire.
Wards affected: (All Wards);
Lead officer: Hannah McSherry
14/01/2022 - Citizens Assembly ref: 8472 Recommendations Approved
For Cabinet to approve the citizens’ assembly. Cabinet to also allocate the new homes bonus funding allocation to the managing climate change ear marked reserve, to enable the views of the assembly to shape the use of the reserve.
Decision Maker: Leader of the Council (Section 9E)
Decision published: 14/01/2022
Effective from: 21/01/2022
Decision:
That:
a) Cabinet approve the principles of citizens assembly as described in this report;
Wards affected: (All Wards);
Lead officer: Josie Rushgrove
13/01/2022 - To defray the Stronger Towns Fund early 5% release of £1.2m ref: 8490 Recommendations Approved
To enable the Town Deal projects within the
programme to access the early 5% programme release to pay for work
to support the development of the final business case.
The council to enter into funding agreements between the projects
that require the funding
Decision Maker: Director of Resources and Assurance
Decision published: 14/01/2022
Effective from: 13/01/2022
Lead officer: Joni Hughes
13/01/2022 - Commissioning of professional advice to complete the update (due to delays in sale) to the site valuation before purchase of land at the rear of 72 Whitecross Road, Hereford HR4 0DG ahead of the Council purchase. The cost of the work is £650 ref: 8489 Recommendations Approved
The council is keen to progress the
investigation of delivering affordable housing as quickly as
possible. Expert advice is required to inform decisions regarding
the site value of any purchase of third party owned housing schemes
on across Herefordshire.
Fisher German have already completed an initial Red Book Valuation
and initial assessment of the site. A minor review only will be
required due to changes to the property market over the last six
months since the initial Red Book Valuation was completed. The
property remains the same.
Decision Maker: Director of Resources and Assurance
Decision published: 14/01/2022
Effective from: 13/01/2022
Lead officer: Joanne Goodwin
31/12/2021 - Recovery of debt from unpaid parking Penalty Charge Notices ref: 8487 Recommendations Approved
In order to effectively manage the councils
highway network in respect of parking, occasionally a Penalty
Charge Notice needs to be issued to a vehicle. Where payment is not
made in respect of these the relevant legislation provides for debt
to be pursued.
In order for the council to continue to exercise its public duty,
and recover all associated costs with the enforcement of parking
contraventions, and to ensure that the principles of enforcement
are not undermined, it is appropriate to take all legal and
necessary steps to obtain payment.
Notwithstanding a review of any correspondence received against any
of these matters, and the councils underpinning duty to protect
those that are vulnerable, the following documents have been served
in accordance with legislation in the last period.
December 2021
Charge Certificate – 293
Order for Recovery – 153
In the same period 159 were warrants were executed for the councils
contracted Enforcement Agency (Bailiffs) to, in accordance with the
relevant legislation, make enquires and enforce the outstanding
debt.
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 12/01/2022
Effective from: 31/12/2021
Lead officer: James Hughes
12/01/2022 - Children Improvement Plan - Progress Update Recommendations Approved
2 monthly to provide an update of progress and
seek the view of Scrutiny Committee.
Decision Maker: Children and Young People Scrutiny Committee
Decision due date: 22/02/2022
Wards affected: (All Wards);
Lead officer: Darryl Freeman, Jean Saunders
Notice of decision: 12/01/2022
Anticipated restriction: Open
20/12/2021 - Contract Variation for Blue Badge Case Management system ref: 8486 Recommendations Approved
The Blue Badge Case Management System contract
was awarded for an initial one year period from 19th December 2018
and extensions were utilised with the contract ending 18th December
2021.
A new corporate CRM solution is currently being designed and
procured to not only support existing council requirements but
deliver an ambitious transformation programme and a revised
customer service strategy. Once the initial implementation is
completed work will commence to make available the Blue Badge
functionality within the CRM system.
Mobilisation for the first phase of the CRM system is sited as July
2022 but the current scope does not detail a timescale for the Blue
Badge element. Therefore the contract extension will enable the
council to continue to process Blue Badge applications while a new
corporate, fully integrated CRM system is designed, procured and
implemented and allow for any lapse in proposed draft
timetable.
Decision Maker: Interim Assistant Director, All Ages Commissioning
Decision published: 12/01/2022
Effective from: 20/12/2021
Lead officer: Ewen Archibald
13/12/2021 - Record Of Officers Decision to spend from the Property Services Planned and Reactive Maintenance budget 2021/22 on the procured security services to various Buildings. ref: 8485 Recommendations Approved
This decision is to award a two year security
service contract to Octaga Security Services Ltd
Decision Maker: Director of Economy and Place (Historic)
Decision published: 12/01/2022
Effective from: 13/12/2021
Lead officer: Neil Taylor
11/01/2022 - National Bus Strategy - Contract Variation ref: 8484 Recommendations Approved
Government published its National Bus Strategy
(NBS) in March 2021 and this set out the approach it wished local
transport authorities to take in developing improved local bus
services with a promise of additional funding to support delivery
of proposals. The government has provided £165k to the
council to support its development of proposals.
The council commissioned Integrated Transport Planning (ITP) in
June 2021 to assist in progressing its response to the NBS. The
decision to award the contract was taken 8 June 2021 and can be
viewed here.
The cabinet member for infrastructure and transport confirmed that
the council’s approach would be to establish an enhanced
partnership with local bus operators. The decision to progress an
enhanced partnership was taken 18 June 2021 and can be viewed
here.
Whilst most local transport authorities, in line with government
guidance, are progressing enhanced partnerships the council is keen
to explore the possibility for an approach based on bus
franchising. This takes into account the low service coverage
across the county, instability in the local bus market and the need
to consider all available options.
On this basis, the cabinet member has asked officers to progress a
technical assessment of the opportunity for bus franchising in
Herefordshire and to answer the following questions:
• Can we do it
• How do we do it
• What would it cost
• How do we fund it
The current commission with ITP is based on its technical
competence in terms of public transport policy and strategy and
also value for money as assessed through an open procurement
process. Hence, it is considered that a contract variation,
consistent with the council’s contracts variation process, is
progressed with ITP to undertake this work.
Decision Maker: Service Director – Environment , Highways, & Waste
Decision published: 11/01/2022
Effective from: 11/01/2022
Lead officer: Phil Crossland
11/01/2022 - Herefordshire Local Plan 2021-2041 Spatial Options public consultation ref: 8483 Recommendations Approved
• The Herefordshire Local Plan - Core
Strategy was adopted in 2015. The National Planning Policy
Framework (NPPF) requires that local authorities should review
their local plan every five years to determine if an update is
required. Herefordshire Council resolved in November 2020 that an
update of the Local Plan would be required.
• Regulation 18 of the Town and Country Planning (Local
Planning) (England) Regulations 2012 (as amended) requires that
public consultation takes place at key stages during the
preparation of a Local Plan.
• The new Local Plan will help shape growth and development
across the county over the period from 2021 to 2041. The Plan will
seek to ensure that we deliver the required homes, jobs,
infrastructure and services to support growth in a way that is
appropriate for the rural and historic character of the
County.
• Vision/Objectives & Spatial Options have been developed
in conjunction with Local Plan Cabinet Members Group.
• The document includes proposed vision/objectives 5 spatial
options demonstrating how new housing development could be
distributed across the County and a range of options for the
overall approach to new development in the rural areas.
• It is proposed to undertake the public consultation from 17
January until 28 February 2022. The Spatial Options paper will be
available to download from the Herefordshire website and view via
an online consultation platform. Printed copies will be made
available on request. It is intended to send posters and flyers to
every town and parish council to post on their noticeboards and
local parish magazines. A presentation for parish councils will
also take place during the consultation period. Email notifications
will be sent to all consultees and individuals registered on the
Local Plan consultation database.
• Information points, including Talk Community Hubs and
Libraries will be used to spread information about the
consultation.
• The spatial options consultation results will help form the
preferred options for housing distribution across the county.
• This will be the first of a series of Local Plan
consultations undertaken over the next few months as options for
the Local Plan are developed.
Decision Maker: Service Director - Economy and Regulatory
Decision published: 11/01/2022
Effective from: 11/01/2022
Lead officer: Florence Churchill
11/01/2022 - Covid Recovery Plan- Rural Cycle Greenways GVAG ref: 8482 Recommendations Approved
This decision confirms award of grant to
community projects under the Covid Recovery Plan.
On 24th June 2021 Cabinet approved £1m of funding to progress
a range of travel focused initiatives to support the Covid-19
Recovery Plan 2021/22.
https://hc-modgov.herefordshire.gov.uk/documents/s50090724/Appendix%201%20Covid%2019%20Economic%20Recovery%20Plan.pdf
Under the theme of safe and welcoming places the agreed plan
includes ‘Return to Towns and City’ which identified
various activities including:
• feasibility for future cycling connectivity routes.
During the development of the Recovery Plan cabinet asked that
funds be made available for technical feasibility studies of rural
walking and cycling greenways which are being promoted by local
community groups
Decision Maker: Director of Economy and Place (Historic)
Decision published: 11/01/2022
Effective from: 11/01/2022
Lead officer: Neil Taylor
11/01/2022 - Covid Recovery Plan- Rural Cycle Greenways ref: 8481 Recommendations Approved
This decision confirms award of grant to
community projects under the Covid Recovery Plan.
On 24th June 2021 Cabinet approved £1m of funding to progress
a range of travel focused initiatives to support the Covid-19
Recovery Plan 2021/22.
https://hc-modgov.herefordshire.gov.uk/documents/s50090724/Appendix%201%20Covid%2019%20Economic%20Recovery%20Plan.pdf
Under the theme of safe and welcoming places the agreed plan
includes ‘Return to Towns and City’ which identified
various activities including:
• feasibility for future cycling connectivity routes.
During the development of the Recovery Plan cabinet asked that
funds be made available for technical feasibility studies of rural
walking and cycling greenways which are being promoted by local
community groups.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 11/01/2022
Effective from: 11/01/2022
Lead officer: Neil Taylor
08/12/2021 - Decision to prosecute an individual under Section 117 of the Road Traffic Regulation Act 1984. Central Ward. 08.12.21 ref: 8480 Recommendations Approved
To prosecute the defendant for offences under
the Road Traffic Regulation Act 1984, Section 117
Decision Maker: Director of Economy and Place (Historic)
Decision published: 10/01/2022
Effective from: 08/12/2021
Lead officer: Neil Taylor
08/12/2021 - Decision to prosecute an individual for failing to secure regular attendance of a school age child. Ross on Wye. 08/12/2021 ref: 8478 Recommendations Approved
To prosecute, using the Single Justice
Procedure, one defendant for failing to secure the attendance of a
compulsory school age registered child from the dates of 17th May
to 9th July 2021. Contrary to Section 444(1) of the Education Act
1996
Decision Maker: Director of Economy and Place (Historic)
Decision published: 10/01/2022
Effective from: 08/12/2021
Lead officer: Marc Willimont
07/01/2022 - Commissioning of professional services to complete outline design up to outline planning submission for the Holme Lacy and The Paddock sites. The cost of the contract is up to £38,256 ref: 8477 Recommendations Approved
To assess the viability of the Holme Lacy Site
and The Paddock as affordable houses and/or to provide the
potential for a capital receipt to cross-subsidise other schemes, a
third party design team will need to be engaged to complete outline
designs, site surveys and complete the planning application
submission.
Oxford Architects LLP have the expertise in this area and are able
to complete the outline design and planning application
submission.
The council has opted to use an Open Single Stage Tender Process to
assess the value for money of this contract. The procurement
process complied with the council’s contract procedure rules
for a contract of this value.
Decision Maker: Director of Resources and Assurance
Decision published: 10/01/2022
Effective from: 07/01/2022
Lead officer: Nigel Thomas
06/01/2022 - To spend from the Property Services Estates Capital Works Programme on remedial works to Plough Lane Ceilings ref: 8476 Recommendations Approved
Approval was granted to carry out the
Improvements to air conditioning/ chiller/ heating pipework at
Plough Lane.
https://hc-modgov.herefordshire.gov.uk/ieDecisionDetails.aspx?ID=8145
The site survey for the pipework highlighted issues with the
ceiling grids, the ceiling void equipment supports and the ceiling
void fire barriers and a further survey was commissioned to assess
and cost these issues.
To ensure a cost effective solution was achieved the incumbent
Contractor TClarke Contracting Ltd. was requested to quote for this
work, which amounts to £188,243. Utilising the same
contractor ensures the rates quoted are comparable with the
tendered rates and will mitigate disruption as ceilings will only
need to be removed once and the works above the ceilings can be
coordinated.
As a result, the existing budget will require up to an additional
£100k to complete the works. The total cost for the project,
inclusive of the 100k being requested, is £492,232.
Decision Maker: Acting Head of Property (Historic)
Decision published: 10/01/2022
Effective from: 06/01/2022
Lead officer: Sarah Jowett
07/01/2022 - To approve spending of the Omicron Hospitality and Leisure Grant to business rated businesses ref: 8475 Recommendations Approved
This funding is the latest announced to
support business rated businesses impacted by the latest strain of
Covid 19, omicron.
Funding is available to business rated properties in the
hospitality, leisure and accommodation sectors, these are defined
in the national guidance, extract copied below;-
Eligible businesses must have been trading on 30 December 2021
to
receive funding under this scheme.
The value of the grant depends on the business rated property
rateable value (RV), as follows;-
1. RV exactly £15,000 or under, £2,667 grant
2. RV over £15,000 and less than £51,000, £4,000
grant
3. RV exactly £51,000 or over, £6,000 grant
A number of pre payment data collection requirements have been
stipulated that are not already available therefore an online
application form will be launched for eligible recipients to apply
for grant support. The data collection requirements include;-
a. Name of business
b. Business Trading Address including postcode
c. Unique identifier (preferably Company Reference Number (CRN))
if
applicable. If not applicable, VAT Registration Number, Self-
Assessment/Partnership Number, National Insurance Number,
Unique
Taxpayer Reference, Registered Charity Number will also be
acceptable)
d. High level SIC Code
e. Nature of Business
f. Date business established
g. Number of employees
h. Business rate account number
i. Cumulative total of previous funding received under all
COVID-19
business grants schemes
Following receipt of applications trading and bank account
verification must be completed before grant support can be
paid.
Applications must be received before 28 February 2022 and all final
payments must be made and dispersed to recipients by 31 March
2022.
Decision Maker: Director of Resources and Assurance
Decision published: 10/01/2022
Effective from: 07/01/2022
Lead officer: Josie Rushgrove
03/12/2021 - Decision to prosecute an individual under section 117 of the Road Traffic Regulation Act 1984. Central Ward. 03.12.21 ref: 8479 For Determination
To prosecute the defendant for offences under
the Road Traffic Regulation Act 1984, Section 117
Decision Maker: Director of Economy and Place (Historic)
Decision published: 10/01/2022
Effective from: 03/12/2021
Lead officer: Neil Taylor
07/01/2022 - Additional Restrictions Grant (ARG) Omicron business grant - January 2021 ref: 8474 Recommendations Approved
In response to the various national lockdowns
commencing in March 2020, the government has provided an economic
support package that included financial support to businesses and
charities in the form of business grants to be administered by
local authorities.
The business grant support has come in two forms:
• Support for businesses and charities on the Valuation Office
Agency (VOA) ratings list;
• ARG support for businesses and charities not on the VOA
ratings list, used to address local priorities.
The council has previously received £7.360m of ARG from the
government. Of this amount a total of £304,000 remains as of
7 January 2022.
On 21 December 2021, Government announced the introduction of a
further top up of ARG funds to be awarded to Local Authorities in
response to the Omicron variant of COVID19. This top up funding
totals £102 million which will be allocated to Local
Authorities in England from 30 December 2021. The council has
received an award of £440,000 rom this fund.
The amount of ARG funding available to support Herefordshire
businesses and charities will be £740,000. This decision
approves the acceptance and spend of this funding awarded to the
council by government from the third top up of ARG funding.
The government issued guidance states that Local Authorities should
continue to issue grants at their discretion, based on local
economic needs, but have provided within the guidance a suggested
list of sectors to be prioritised for support.
The government guidance on the ARG scheme states that unlike
previous ARG funding this top up funding cannot be used by Local
Authorities for wider business support activities.
All ARG funding is required to be allocated by the end of March
2022. It is intended that all of the council’s remaining ARG
funding as well the ‘top up’ amount will be utilised
through the following scheme.
Proposed Approach to the ARG Omicron business grant
Given the urgent need to support businesses and charities affected
by the response to the Omicron variant of COVID19, the council is
developing and implementing an ARG Omicron business grant as
quickly as possible.
It is proposed to open an ARG grant scheme to businesses and
charities in those sectors most impacted by the restrictions
introduced in December 2021. In line with the government guidance
for the ARG support, and local priorities, these sectors are:
a. Hospitality and supply chain
b. Accommodation and supply chain,
c. Leisure and supply chain,
d. Personal care
e. the travel and tourism sector, including group travel, travel
agents and tour operators,
f. coach operators,
g. wedding industries and supply chain,
h. nightclubs,
i. theatres,
j. events industries,
k. wholesalers,
l. English language schools,
m. breweries,
n. freelance and mobile businesses
o. gyms
As with previous ARG schemes, and in accordance with the government
guidance requirements, businesses and charities will need to
complete an application process. This will be an online based
process accessible from the council website. Officers will provide
guidance and definitions to accompany the application
process.
The government is providing support to rateable businesses within
the Hospitality and Leisure sectors via the Omicron Hospitality
and
Leisure Grant. Rateable businesses in the sectors listed above
which are ineligible for the Omicron Hospitality and Leisure Grant
will be able to receive support via the ARG Omicron grant.
The scale of award made to businesses and charities will vary
depending on employee numbers, the table below demonstrates the
suggested award levels:
FTE Count (min stated) Award
0.5 – 1 £500
1.1 – 2 £1,000
2.1 – 3 £1,500
3.1 – 4 £2,000
4.1 – 5 £2,500
5+ £3,000
The council reserve the right to alter the above bandings to
reflect any change in circumstances. All ARG funding allocated to
the council will be utilised through the grant scheme prior to the
end of March 2022 deadline. Delegation is given to the Head of
Economy and/or the Economic Development Manager to amend the
banding.
The Head of Economy and the Economic Development Manager are
authorised to finalise the specific grant criteria and application
process and are authorised to approve grant awards to businesses
and charities following satisfactory assessment of the applications
received (up to a value of £10,000 per
business/charity).
The eligibility criteria for applicants broadly matches the
previous ARG criteria and includes:
1. Must be a business or a registered charity;
2. Must employ someone for at least 15 hours per week within/from
Herefordshire (charities can include volunteer time) and this can
include the business owner(s) or director(s);
3. Either has a business rating or can demonstrate that the
business or charity trades most weeks of the year from/within
Herefordshire.
Unlike previous ARG schemes government guidance states there is no
starting date from which businesses must have been trading or
charities established in order to qualify for grant funding
To comply with the government’s ARG criteria, proof of
trading checks will be required, and the council will need to
ensure it holds the following information for each business:
a) Name of business/charity
b) Business trading address/ charity registered address including
postcode
c) Unique identifier
d) High level SIC Code
e) Nature of business/charity
f) Date business/charity established
g) Number of employees
h) Business rate account number (if applicable)
i) Cumulative total of previous funding received under all COVID-19
grants schemes
Decision Maker: Corporate Director – Economy & Environment
Decision published: 07/01/2022
Effective from: 07/01/2022
Lead officer: Neil Taylor
07/01/2022 - Appointments to Council Committees
To make appointments to vacant positions of
chairpersons and vice-chairpersons of council committees.
Decision Maker: Council
Decision due date: 28/01/2022
Wards affected: (All Wards);
Lead officer: Matthew Evans
Notice of decision: 07/01/2022
Anticipated restriction: Open
07/01/2022 - Decision to spend on improvement and repairs to the concrete frame and cladding panels at the Salt Barn Storage Depot, Kingsland ref: 8473 Recommendations Approved
The latest condition survey highlighted
repairs or replacement of the lower section concrete wall/surround
and works to the cladded upper walls
S C Joseph Ltd have been identified as the bidder
representing
best value for money following a competitive tender and
assessment
process in accordance with Council procurement procedures.
Tenders
were invited from four prospective companies and two returned valid
tenders for consideration.
The work to be awarded to S C Joseph Ltd at a cost of £61,409
out of the £90,000 capital budget.
There is also a boost to the local economy as S C Joseph Ltd are a
local contractor.
The Cabinet Member Infrastructure and Transport took a decision 26
April 2021 to confirm the annual plan 2021/22 for the public realm
services contract with Balfour Beatty Living Places. This decision
authorised:
the acting assistant director highways and transport be authorised
to agree in consultation with the Section 151 officer, through the
BBLP contract governance arrangements, final adjustments to the
programme (including any recommendations from the strategic
partnering board) and budget allocation to each of the annex and
any in year adjustments to the plan, within the overall
budget.
This decision can be viewed using the following link:
http://councillors.herefordshire.gov.uk/ieDecisionDetails.aspx?ID=7852
Utilisation of £40K LTP funding can be accommodated within
existing budget and this work is relevant to the terms of the LTP
funding grant
Decision Maker: Acting Head of Property (Historic)
Decision published: 07/01/2022
Effective from: 07/01/2022
Lead officer: Sarah Jowett
06/01/2022 - Consolidation of Map Based Scheduling for Speed Limit Orders and Moving Traffic Orders ref: 8471 Recommendations Approved
To implement the consolidation of existing
Speed Limit Orders and Moving Traffic Regulation Orders throughout
the Herefordshire County Council (The Highway Authority) maintained
Highway Network.
Decision Maker: Service Director – Environment , Highways, & Waste
Decision published: 06/01/2022
Effective from: 06/01/2022
Lead officer: Phil Crossland
06/01/2022 - Award of transport contracts (Ref 1221) ref: 8470 Recommendations Approved
To ensure that the council manages its
transport services effectively whilst also meeting its statutory
duties and ensures children are transported to school in line with
eligibility.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 06/01/2022
Effective from: 06/01/2022
Lead officer: Neil Taylor
06/01/2022 - Anti Fraud and Corruption annual report
To provide an annual update to the committee
on counter fraud activity.
Decision Maker: Audit and Governance Committee
Decision due date: 25/01/2022
Wards affected: (All Wards);
Lead officer: Josie Rushgrove
Notice of decision: 06/01/2022
Anticipated restriction: Open
05/01/2022 - Purchase of Green Cycle Shelters as part of the Hereford City Centre Improvements (HCCI) ref: 8469 Recommendations Approved
Cabinet Member Infrastructure and Transport
took a decision 7 October 2021 to approve the progression of the
HCCI project. This included a provision for the installation of
city green cycle shelters.
A design process to identify the type of green cycle shelters to be
purchased has been undertaken which has included consultation with
the Cabinet Member Infrastructure and Transport.
BBLP’s have sought the following quotations for the supply of
green cycle shelters.
Supplier Quotation
1 £22,070
2 £20,270
3 Declined to quote.
Whilst it is noted that supplier two offers a lower cost, the first
supplier has been selected on the basis of quality, consistency
with other street furniture materials, lower maintenance
requirement and extended life cost and is therefore considered to
represent better value for money.
A further BBLP proposal is to be provided which includes
installation costs for a concrete base and power supply to allow
lighting in the shelters. Additionally tree pruning will be
required over one of the shelters to allow the sedum to flourish. A
proposal and permit to carry out this work is to be provided. These
works will be managed within the allocated budget.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 05/01/2022
Effective from: 05/01/2022
Lead officer: Neil Taylor
04/01/2022 - Annual Governance Statement 2020-21 Actions
Based on the final version of the Annual
Governance Statement agree in September 2021 an action plan has
been formed based on continuous improvement requirements. This
report provides a half year review of the actions.
The report also outlines future arrangements for producing the
annual governance statement.
Decision Maker: Audit and Governance Committee
Decision due date: 25/01/2022
Wards affected: (All Wards);
Lead officer: Natalia Silver
Notice of decision: 04/01/2022
Anticipated restriction: Open
04/01/2022 - Pay Policy Statement
To recommend the 2022 pay policy statement to
full council for approval and publication.
Decision Maker: Employment Panel, Council
Decision due date: 11/02/2022
Wards affected: (All Wards);
Lead officer: Tracey Sampson
Notice of decision: 04/01/2022
Anticipated restriction: Open