Issue details

Preparation of the land to the south of Station Approach (Essex Arms site) for development

Approve works necessary for the preparation of the land to the south of Station Approach (Essex Arms site) for development.

 

The Essex Arms site (appendix 1) lies to the south of the Station Approach (City Link Road CLR) which forms the northern boundary of the site. The site has been opened up for development as a result of the construction of the CLR which has enabled access to the site.

 

However the site in its current form cannot be developed as it is subject to flooding due to its low laying topography, and throughout the master planning for the Edgar Street Grid (ESG) regeneration area, it was known that part of the site would need to be raised so the ground level was equal to its neighbours to allow it to be de redeveloped as part of the Urban Village.

 

Highways access to the site is achieved from Station Approach (the CLR), and a final phase of the CLR scheme will be the physical works required to realign Widemarsh Brook, and create an attenuation pond as part of the drainage strategy for the CLR. The scope of these works is limited to diverting the watercourse from the eastern boundary over to the west and includes constructing a new bank to retain and define the new route of the watercourse.

 

Therefore consideration now needs to be paid to the necessity to raise the net developable area in order to realise the economic benefits of the CLR. This report seeks approval for a package of survey work and technical design to inform  the form of the ground raising works, to enable future development of the site. The proposal is that the works are brought forward promptly to enable an early start of the development of this site, to support the university or other potential occupiers.

 

The budget for these design and investigatory works are £45,000 which includes contingency to allow for additional survey work should initial investigations reveal issues around contamination and/or ecology beyond those already assumed and planned for.

 

A further report will be brought forward to seek approval for the physical ground raising works once these initial investigation and design works have been completed as they will define what is required including target costs.

Decision type: Non-key

Decision status: Recommendations Approved

Wards affected: Widemarsh;

Notice of proposed decision first published: 12/12/2018

Decision due: Before 29 January 2019 by Director of Economy and Place (Historic)

Lead member: Cabinet member contracts and assets

Lead director: Director of Economy and Place (Historic)

Department: Economy and Place (Historic)

Contact: Peter Clasby, Growth Programmes Technical Manager Email: Peter.Clasby@herefordshire.gov.uk Tel: 01432 261968.