06/04/2021 - Decision to replace flat roof coverings at the Hope Centre, Bromyard ref: 7837 Recommendations Approved
S C Joseph Ltd have been identified as the
bidder representing best value for money following a competitive
tender via the SouthWest Portal and assessment process in
accordance with Council procurement procedures. An open tender was
published and two valid tenders were received for consideration.
The work is to be awarded to S C Joseph Ltd with a tender value of
£41,126.00.
The works will prevent further deterioration of the asset, improve
insulation and reduce heat loss and enable business continuity and
to facilitate the transfer of the freehold interest in the building
to the Hope Family Centre.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 08/04/2021
Effective from: 06/04/2021
Lead officer: Chris Jenner
07/04/2021 - Update on Internal Audit Recommendations Recommendations Approved
To provide an update to the committee on
progress against internal audit recommendations
activities.
Decision Maker: Audit and Governance Committee
Decision due date: 04/05/2021
Wards affected: (All Wards);
Lead officer: Paul Harris
Notice of decision: 07/04/2021
Anticipated restriction: Open
07/04/2021 - 210437 - 22 LADY SOMERSET DRIVE, LEDBURY, HEREFORDSHIRE, HR8 2FF ref: 7833 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 07/04/2021 - Planning and Regulatory Committee
Decision published: 07/04/2021
Effective from: 07/04/2021
Decision:
The application was approved in accordance with the Case Officer’s recommendation.
07/04/2021 - 202265 - LAND SOUTH WEST OF ORCHARD CLOSE, DILWYN, HEREFORDSHIRE, HR4 8HQ ref: 7832 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 07/04/2021 - Planning and Regulatory Committee
Decision published: 07/04/2021
Effective from: 07/04/2021
Decision:
The application was refused in accordance with the Case Officer’s recommendation.
Wards affected: Weobley;
07/04/2021 - 204252 - HEREFORDSHIRE FOOTBALL ASSOCIATION, WIDEMARSH COMMON, HEREFORD, HEREFORDSHIRE, HR4 9NA ref: 7834 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 07/04/2021 - Planning and Regulatory Committee
Decision published: 07/04/2021
Effective from: 07/04/2021
Decision:
The application was approved in accordance with the Case Officer’s recommendation with amended conditions.
Wards affected: Widemarsh;
07/04/2021 - 210086 - CHASEWOOD, 42 EASTFIELD ROAD, ROSS-ON-WYE, HEREFORDSHIRE, HR9 5JZ ref: 7835 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 07/04/2021 - Planning and Regulatory Committee
Decision published: 07/04/2021
Effective from: 07/04/2021
Decision:
The application was approved in accordance with the Case Officer’s recommendation.
Wards affected: Ross East;
06/04/2021 - Fastershire Community Grant Scheme Approvals Q4 2020/21 ref: 7830 Recommendations Approved
This quarter has seen the first four projects
come forward for funding from the Fastershire Community Grant which
was launched in December 2020.
The four communities are very different in size, remoteness and
viability. The table below details the key information relating to
each project.
Community Participating Other Selected
premises benefitting Supplier Total Cost Required
with premises £’000 Funding
<30Mbps with <30Mbps £’000
Birley, Upper Hill
& Aulden 28 17 Full Fibre Ltd 196,610 192,637.08
Nash & Knill 24 7 Airband 149,533 137,533
Cinderford 87 497 Full Fibre Ltd 3,112,006 28,675
Northwick Park
& Draycott 78 110 Gigaclear 231,104 94,603
Total 217 631 3,689,253 453,448.08
Cinderford, being a small town, is the clear outlier and the
exercise has done more to bring the viability of the area to the
attention of suppliers than plug any major funding gap. However, it
is unlikely that many similar schemes to Cinderford will come
through the grant and the other three are more representative of
the type of projects that will come through in the future.
Despite the disparity in cost vs benefit, each project passed the
Value for Money test detailed in the Fastershire Broadband Strategy
and was therefore approved.
These early projects have successfully proved the concept of the
Fastershire Community Grant, enabling the project to facilitate
superfast connectivity to 848 hitherto STD (Still To Do) premises,
nearly 10% of the residual premises that are left without a
contracted solution.
Decision Maker: Assistant director Corporate Support (Historic)
Decision published: 07/04/2021
Effective from: 06/04/2021
Lead officer: Natalia Silver
07/04/2021 - Reinstatement of existing highways amenity licensing/pavement licensing (pavement café) activity in relation to the covid19 outbreak ref: 7831 Recommendations Approved
Government advice was that the hospitality
venues must close from 31 December 2020 unless operating as a
takeaway/delivery operation.
The council suspended highways amenity and pavement licences on 31
December 2021, see Covid HAL/PL suspension decision 31.12.20
Businesses that remained open under that capacity did so without
seating areas.
Those businesses that have either a highways amenity licence or a
pavement licence for external seating areas will be permitted to
reintroduce those areas from 12 April 2021.
Decision Maker: Assistant Director for Technical Services
Decision published: 07/04/2021
Effective from: 07/04/2021
Lead officer: Kevin Price
07/04/2021 - Withdrawal of the Bromyard Depot Site from the DRP ref: 7822 Recommendations Approved
To withdraw the Bromyard Depot from the
Development Regeneration Partnership (DRP) as the council has not
been able to secure vacant possession of the entire development
site, and therefore current scheme cannot be taken forward at this
time.
Decision Maker: Cabinet Member housing, regulatory services and community
Decision published: 07/04/2021
Effective from: 14/04/2021
Decision:
That:
a) The Bromyard Depot site is withdrawn from the Development Regeneration Partnership as the consented housing scheme is not deliverable at this time; and
b) Keepmoat Housing Limited are reimbursed for the development costs incurred to date (£201,222), in accordance with the requirements of the Development Regeneration Partnership Overarching Agreement.
Wards affected: Bromyard West;
Lead officer: Roger Allonby
26/03/2021 - Decision to prosecute an individual under section 117 of the Road Traffic Regulation Act 1984 for blue badge misuse in Union Street. Hereford. Central Ward. 26.03.21 ref: 7829 Recommendations Approved
To prosecute the defendant for offences under
the Road Traffic Regulation Act 1984, Section 117
Decision Maker: Chief executive
Decision published: 06/04/2021
Effective from: 26/03/2021
Lead officer: Richard Ball
26/03/2021 - Decision to issue a simple caution against an individual under section 117 of the Road Traffic Regulation Act 1984 for blue badge misuse. Central Ward. 26.03.21 ref: 7828 Recommendations Approved
To issue the defendant a simple caution for
offences under the Road Traffic Regulation Act 1984, Section
117
Decision Maker: Chief executive
Decision published: 06/04/2021
Effective from: 26/03/2021
Lead officer: Richard Ball
30/03/2021 - Award contracts for the provision of Fastershire beginners’ internet training workshops and support ref: 7827 Recommendations Approved
The council via the Fastershire project has
identified that Herefordshire residents would benefit from training
to enable them to better understand the advantages of going online
and to develop the skills to use the internet. Therefore the
council is seeking to commission ICT training providers to deliver
beginners’ internet and computer training workshops and
support in Herefordshire for the period 1st May 2021 to 31st March
2023 to a maximum cost of £15,000 per annum. With potential
extension of the contract a further 12 months.
An Invitation to Tender was published via the council’s
e-tendering portal and, following compliance checks and the
evaluation of the quality elements of the bids, the Evaluation
Panel recommends that four providers are awarded contracts to admit
them onto the approved list of providers to deliver
beginners’ internet and computer training workshops for
Fastershire.
It is anticipated that not all workshops will be allocated to the
same provider, as this will be based on lowest price and provider
availability for each workshop.
Decision Maker: Assistant director Corporate Support (Historic)
Decision published: 06/04/2021
Effective from: 30/03/2021
Lead officer: Natalia Silver
31/03/2021 - Decision to procure a logging and tracking system for recording complaints and information requests ref: 7826 Recommendations Approved
A decision was made in December 2020 to
re-procure the CRM (customer relationship management) to log and
track complaints and FOI (freedom on information requests). The
current system is obsolete and ICT Services are decommissioning the
application.
A tender process was conducted and concluded with contract award to
Fivium to provide eCase the software.
The cost of implementation is £4,800 and annual support costs
for the next 3 years are £15,750 per annum.
Logging and tracking of complaints and information requests is
necessary to ensure that compliance with statutory deadlines is
met.
Better reporting functions are required to be able to identify
trends, issues and volumes which can be used for learning within
the council to improve services and transparency.
There is no current provision or capacity in the system to provide
a disclosure log of information provided in response to requests
under the Freedom of Information Act 2000 or the Environmental
Information Regulations 2004.
Decision Maker: Assistant director Corporate Support (Historic)
Decision published: 06/04/2021
Effective from: 31/03/2021
Lead officer: Natalia Silver
06/04/2021 - Decision to appoint a consultant to undertake research and evaluation of the Marches Investment Fund Visitor Economy Project ref: 7825 Recommendations Approved
The Herefordshire visitor economy has been
severely impacted by Covid 19 and the resulting lockdown. Tourism
accommodation and attractions, cultural venues, hospitality
businesses, non-essential retailers were instructed by government
to close for circa 3 months during the start of their usual peak
season period. Many of these businesses have then faced a second
period of lockdown in November 2020 This has significantly
threatened the viability of these businesses, and put at risk of
redundancy the large numbers of people they employ.
In May the Marches LEP allocated £444,220 to Herefordshire to
support Covid 19 economic recovery, subject to the development of a
business case. Herefordshire Council in partnership with the
Herefordshire Business Board established and submitted a business
case focussed on supporting the soonest possible recovery of the
visitor economy. Shropshire Council (as the accountable body) on
behalf of the Marches LEP issued a funding offer letter to
Herefordshire Council on the 17th June, and the Cabinet Member for
Environment Economy and Skills took a decision to accept the grant
and implement the project on the 20th June.
Recognising the need to engage with visitor economy businesses to
co-ordinate delivery and to seek relevant expertise, a project
steering group was formed in June 2020.
The business case for the Visitor Economy project identified the
need for research and evaluation of the project that will benchmark
and show the impact of the Visitor Economy project, in particular
of the impact of the marketing and PR campaigns, to evidence return
on investment and to inform future activity.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 06/04/2021
Effective from: 06/04/2021
Lead officer: Roger Allonby
06/04/2021 - Bereavement Services - Service review and Charges ref: 7804 Recommendations Approved
To consider and approve new service charges and changes to service times for Bereavement Services.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 06/04/2021
Effective from: 13/04/2021
Decision:
That:
a) Charges are amended for Bereavement Services, as shown in appendix 1, to take effect on 1st May 2021 are approved; and
b) The cremation service times are increased to reflect the need of the bereaved to have sufficient time to pay their respects, as shown in appendix 2 are approved; and
c) Pre-purchasing of burial plots in Hereford, Kington and Wigmore Cemeteries is no longer offered.
Wards affected: (All Wards);
Lead officer: John Gibbon
21/03/2021 - To endorse and sign the new AONB MoUs for the period 2021-2024 ref: 7824 Recommendations Approved
To endorse and sign the new AONB MoUs for the
period 2021-2024
Decision Maker: Assistant Director for Regulatory, Environment and Waste Services (Historic)
Decision published: 05/04/2021
Effective from: 21/03/2021
Lead officer: Marc Willimont
05/04/2021 - S104 agreement and Deed of Grant of Easement for new foul drainage at the North Magazine, Hereford Enterprise Zone ref: 7823 Recommendations Approved
Detailed technical discussions have taken
place between the EZ’s procured drainage engineers (One Ltd)
and DCWW to agree a suitable drainage design to serve the North
Magazine. Given the multiple potential connections, this needs to
be a public sewer owned by DCWW.
A Section 104 (sewerage adoption) agreement and Grant of Deed of
Easement is required with DCWW to enable them to adopt this
proposed new sewer on the North Magazine. These legal agreements
need to be in place before the installation can start.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 05/04/2021
Effective from: 05/04/2021
Lead officer: Neil Batt
31/03/2021 - Member Development Strategy ref: 7816 Recommendations Approved
To approve and adopt the Council’s Member Development Strategy. Herefordshire Council is committed to providing high quality development to its elected members. This strategy will underpin this commitment to ensure that every Herefordshire councillor has access to the learning and development they need to perform effectively in their role on the council and in supporting their electorate, now and in the future.
Decision Maker: Cabinet member finance and corporate services
Decision published: 31/03/2021
Effective from: 09/04/2021
Decision:
The Member Development Strategy (Appendix A), for 2021-2023 is agreed and formally adopted.
Wards affected: (All Wards);
Lead officer: John Coleman
31/03/2021 - Wildlife and Countryside Act 1981 Application for a Modification Order in the Parish of Little Birch ref: 7821 Recommendations Approved
Summarise why the decision is being taken and
what matters are being taken into account. You can use bullet
points. If there are relevant documents (eg a tender evaluation
report) you can attach them but remember they will be published
with this record so the usual care should be taken that they are
suitable for publication.
If the decision impacts the council’s priorities summarise
how. In particular if the decision affects the lives of looked
after children or care leavers you should explain how.
Decision Maker: Acting Assistant Director for Highways and Transport
Decision published: 31/03/2021
Effective from: 31/03/2021
Lead officer: Mairead Lane
31/03/2021 - Decision to fund uninsured regulatory works at Bromyard Leisure Centre ref: 7820 Recommendations Approved
The Leisure Centre remains closed due to water
damage. Both insured and uninsured re-instatement works are well
underway however to ensure the Centre can be re-opened the
uninsured elements of the regulatory electrical, emergency lighting
and fire alarm installations need to be improved and made
compliant.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 31/03/2021
Effective from: 31/03/2021
Lead officer: Chris Jenner
26/03/2021 - Increase in Pre-Application Fees and removal of discounted fees ref: 7819 Recommendations Approved
To ensure the service provides full cost
recovery for the benefit of Herefordshire residents. The removal of
the exemption category ensures the service is being funded by the
applicant. In addition, the statutory planning application fees
were raised by 20% in January 2018 whereas the council only
increased pre-app fees by 10% in April 2019. Therefore this
additional increase ensures consistency with the uplift in the
national planning fees as well as achieve full cost
recovery.
Decision Maker: Assistant Director for Regulatory, Environment and Waste Services (Historic)
Decision published: 31/03/2021
Effective from: 26/03/2021
Lead officer: Marc Willimont
31/03/2021 - High Needs Budget 2021/22 ref: 7802 Recommendations Approved
To approve the Dedicated Schools Grant (DSG) high needs budget for 2021/22 and the implementation plan for the improvements to the high needs matrix as recommended by Schools Forum.
Decision Maker: Cabinet member children and families
Decision published: 31/03/2021
Effective from: 09/04/2021
Decision:
That:
- a balanced high needs budget for 2021/22 having regard to the views of Schools Forum be approved as follows;
(a) Complex needs funding £2,285,745;
(b) Independent special schools £1,650,000;
(c) Special school top-up funding £3,549,650;
(d) Special school commissioned places £1,643,000;
(e) Post-16 top-up funding £1,500,000
(f) High needs contingency £0;
(g) Mainstream school top-up funding £2,147,525;
(h) Nurture provision, from September 2021 £116,667;
(i) SEN protection scheme for primary and secondary schools £435,000;
(j) H3 Home, Hospital and Hub £432,500;
(k) Autism and Language units top-up funding £362,432;
(l) Pupil Referral Unit support fund £100,000;
(m) Early years top-up funding £175,000;
(n) Autism and Language Units commissioned places £336,000;
(o) Pupil Referral Service top-up funding 65 pupils at £6,700 for the summer term and 40 pupils at £9,048 for autumn and spring terms i.e. total top-up funding £392,578
(p) Pupil Referral Service commissioned places at 65 summer term and 50 autumn and spring £562,500;
(q) SEN support services
(i) Additional Needs Management £203,750;
(ii) Complex Learning Communications £111,550;
(iii) Equalities team –inclusion £263,937;
(iv) Hearing Impaired Team £407,500;
(v) Managed moves £5,000;
(vi) Business support £73,000;
(vii) DSG Services £125,900;
(r) Charges and income
(i) Excluded pupils (AWPU)/ Hospital -£176,000;
(ii) Local authority recoupment -£200,000;
(iii) Transfer from schools block -£300,000;
(iv) Transfer from Central services block -£75,000.
(s) Teachers Pay and Pension Grant allocations £367,000
(t) Beacon College top-up funding for 13 new pupils £101,400
(u) funding for a maximum 20 places for Beacon College be provided at a cost of £200,000 as agreed with the Department for Education;
(v) and the remaining £70,000 provisionally reserved for Beacon College place funding be allocated for out-county independent special school places
- the school financial contribution to the SEN threshold costs within the SEN protection scheme be limited to £150 x the number on roll as at the October 2020 census for the financial year 2021/22
- The implementation timetable for the new high needs matrix be approved as follows;
• The revised high needs matrix be adopted from April 2021
• All new Education Health Care (EHC) Plans will have funding allocated using the updated tariff levels, including those for children and young people attending specialist settings.
• All children and young people reaching ‘phase transfer’ points of Reception, Year 6 and Year 11 will be moved to the revised HNM with the appropriate tariff levels applied.
• All EHC Plans will be moved to the new funding matrix within five years.
• All non EHC Plan Top up Funding applications will be allocated funding using revised HNM.
- The new tariff values be applied to post-16 contracts for the new academic year with effect from 1st August 2021
- The new tariff values be approved as below from April 2021:
Assessment Points |
Tariff |
Funding as at April 2020 |
Including inflation increase in April 2021 and the 3% uplift recommended by Schools Forum 19 March |
Percentage increase |
|
|
£ |
£ |
% |
0 -9 |
Local Offer |
0 |
0 |
0% |
10-14 |
A1 |
696 |
708 |
1.0% |
15 - 19 |
A2 |
1,392 |
1,404 |
1.0% |
20 - 24 |
B1 |
2,400 |
2,424 |
1.0% |
25 - 29 |
B2 |
3,420 |
3,456 |
1.1% |
30 - 34 |
C1 |
4,020 |
4,056 |
1.0% |
35 - 39 |
C2 |
4,620 |
4,668 |
1.0% |
40 - 44 |
C3 |
5,220 |
5,268 |
1.0% |
45 - 49 |
C4 |
5,820 |
5,988 |
2.9% |
50 - 54 |
D1 |
6,900 |
8,040 |
16.5% |
55 - 59 |
D2 |
7,812 |
9,324 |
19.4% |
60 - 64 |
D3 |
8,724 |
10,608 |
21.6% |
65 - 69 |
D4 |
9,624 |
11,892 |
23.6% |
70 - 74 |
E1 |
10,620 |
13,188 |
24.2% |
74 - 79 |
E2 |
11,616 |
14,472 |
24.6% |
80 - 84 |
E3 |
12,600 |
15,756 |
25.0% |
85 - 89 |
E4 |
13,596 |
17,052 |
25.4% |
90 - 94 |
F1 |
14,724 |
18,336 |
24.5% |
95 - 99 |
F2 |
15,864 |
19,620 |
23.7% |
100 - 104 |
F3 |
16,992 |
20,904 |
23.0% |
105 - 109 |
F4 |
18,120 |
22,200 |
22.5% |
- As presented to the Schools Forum on 19th March, the funding originally identified to provide for the Minimum Funding Guarantee for special schools (£100k) and to smooth the introduction of the new tariff funding proposals (£52k) is better allocated as follows;
a) to avoid the minimum funding guarantee for special schools by adding 3% on the tariffs D-F as included in recommendation 5 above at a cost of £80,000;
b) that additional funding of £11,000 be allocated for PRU top-ups to ensure that the PRU is fully funded for top-up D2 at £9,324 per pupil;
c) That the new tariff C4 be confirmed at £ 5,988 which includes an additional £108 at a cost of £11,000 to reduce the funding differential between tariff C4 and tariff D1;
d) that the remaining £50,000 of funding be added to the out county special school.
Wards affected: (All Wards);
Lead officer: Malcolm Green
31/03/2021 - Property services estates capital works programme ref: 7736 Implemented
To agree the property services estates capital works programme.
|
The proposed programme of works as set out in appendix A and B incorporates a series of planned project works that enables the council to deliver on its obligations to maintain buildings fit for purpose utilising the agreed £2.067m capital budget which was approved at council budget meeting of 12 February 2021.
|
Decision Maker: Cabinet member commissioning, procurement and assets
Decision published: 31/03/2021
Effective from: 31/03/2021
Decision:
That:
a) the estate capital programme as set out in appendix A and B be approved at a total cost of not more than £2.067m; and
b) the assistant director for technical services be authorised to take all operational decisions necessary to implement the above recommendation and spend within the approved overall budget of £2.067m for the projects as listed in appendix A and B, provided that the sum of individual project expenditure do not exceed the overall budget.
Wards affected: (All Wards);
Lead officer: GianCarlo Paganuzzi
30/03/2021 - Corporate Risk Register Recommendations Approved
To consider the status of the council's
Corporate Risk Register in order to monitor the effectiveness of
risk management within the Performance Management
Framework.
Decision Maker: Audit and Governance Committee
Decision due date: 04/05/2021
Wards affected: (All Wards);
Lead officer: Paul Harris
Notice of decision: 30/03/2021
Anticipated restriction: Open
30/03/2021 - Disposal of Plot N24 off Canary Way, Skylon View, Hereford Enterprise Zone, Rotherwas ref: 7818 Recommendations Approved
Compliance with approved council policy.
Help to further the establishment of NMITE in Hereford, and in
particular the specialist facilities it needs to engage and work
with local businesses.
Following the award of enterprise zone status in August 2011
approximately 45 hectares (110 acres) of council owned land was
included, along with other privately owned land, in the designated
EZ. The EZ status has resulted in the council and occupiers within
the EZ benefiting from a number of government incentives such as
significantly increased awareness and profile of the location and
opportunity, business rates relief and retention, improved access
to broadband etc. These factors have resulted in an increase in
interest from local, national and international businesses in
active and advanced negotiations with the council to acquire land
within the EZ.
This area of land is located next to the Shell Store at the North
Magazine. We anticipate a good deal of beneficial interaction
between the Shell Store and the new NMITE facilities. The Shell
Store will be a natural location for business start ups generated
by students graduating from NMITE.
The sale of the land is on a freehold basis. The purchaser will not
accept or proceed with the purchase on any other basis.
Granting an option for the 1.6 acres immediately adjoining the site
will give NMITE the certainty they need to help realise their next
stage ambitions which is to build another specialist facility,
subject to funding being available. This option is specific to
NMITE and not transferable, any extension will be at the discretion
of the Council. The sale will be based on market value at the time
the option is exercised.
All the EZ land is being actively marketed, and is being sold
according to independent land valuations and the EZ Land Disposal
Policy which was approved by cabinet member on 7 January 2016. The
agreed purchase price meets the market valuation. Valuation
document attached.
This sale has the full endorsement of the EZ executive board.
The purchaser and their proposal have been assessed by the Hereford
Enterprise Zone Board and deemed to meet the Placement Strategy,
the Board’s set of criteria which each oncoming organization
must achieve in order to progress onto the Enterprise Zone.
The decision to sell this plot supports council policy to use
capital receipts from sale of land within the Enterprise Zone to
fund the capital expenditure on installing necessary infrastructure
across the site. The latest council decision to incur this
expenditure is available via this link:
http://councillors.herefordshire.gov.uk/ieDecisionDetails.aspx?ID=6182
Decision Maker: Director of Economy and Place (Historic)
Decision published: 30/03/2021
Effective from: 30/03/2021
Lead officer: Mark Pearce
31/03/2021 - Refreshed Local Outbreak Management Plan 30.03.21 ref: 7817 Recommendations Approved
The refresh of this document is required by
Public Health regional convenors as soon as possible.
This plan was originally adopted on 30.06.2020
http://councillors.herefordshire.gov.uk/ieDecisionDetails.aspx?ID=6981
The council’s response to the pandemic has evolved and will
continue to do so due to changes in circumstances. Nationally it
was felt that all Local Authority Outbreak Management Plans needed
to be reviewed due to a stronger focus on Enhanced contact tracing
and variants of concern. The aim of the plan is to:
Reduce the spread of infection in Herefordshire, minimise the
number of cases, protect our health and care system, and save
lives;
Support settings experiencing a new localised outbreak or complex
single cases to mitigate the consequences of and help to keep as
many services and businesses going as possible in a way that is
safe and releases our economy; and
Give the public confidence that we are able to respond
appropriately to outbreaks of Covid-1 in order to minimise
anxiety.
Decision Maker: Chief executive
Decision published: 30/03/2021
Effective from: 31/03/2021
Lead officer: Claire Ward
29/03/2021 - Decision to agree and sign the Hoople SLA 21/22 ref: 7815 Recommendations Approved
To agree the Hoople SLA 21/22 allows effective
ongoing management of the services delivered and a mechanism to
monitor these services against.
Decision Maker: Chief finance officer
Decision published: 29/03/2021
Effective from: 29/03/2021
Lead officer: Karen Morris
29/03/2021 - Electricity Installation to Plot C1A and C1B ref: 7813 Recommendations Approved
To award a contract to Rock Power Connections
Limited for the installation of electricity to Plots C1A and C1B.
The quoted cost for delivery of the works is £67,016. An
additional £15,000 contingency needs to be included based on
the risk analysis carried out by SMS plc (Enterprise Zone Utility
Consultants). The total amount required to implement this decision
is therefore £82,016. This additional contingency will cover
any potential changes or modifications to the design and
methodology.
This will be funded £53,612.80 using LEP funds with the
remaining £13,403.20 (plus £15,000 contingency) coming
from Phase 5 Enterprise Zone funds.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 29/03/2021
Effective from: 29/03/2021
Lead officer: Neil Batt
25/03/2021 - Update to emergency decision for Ross on Wye HRC opening with booking system ref: 7810 Recommendations Approved
Previous decision was an emergency decision
taken with regard to Part 3 Section 7 para 3.7.9 of the
constitution on 3 June 2020 by the Director of Economy and Place
and can be viewed here:
http://councillors.herefordshire.gov.uk/ieDecisionDetails.aspx?ID=6916
This decision is to supersede the previous emergency decision and
is taken as a decision to maintain the booking system at Ross on
Wye Household Recycling Centre.
The booking system has been very effective since its introduction
at Ross in June 2020. It has managed the traffic going to the site,
reducing congestion on the public road outside and reducing the
number of people on the site ensuring that safe operation of the
site can be maintained throughout the Covid-19 pandemic.
The introduction of a booking system has also provided the benefits
of:
• Providing residents with more certainty over their access
into the site so they can plan their journey;
• Help to reduce the incident of fly-tipping close to the
sites which is possibly a consequence of people not wanting to wait
to dispose of their waste; and
• Prevented the use of the site by non-Herefordshire residents
resulting in priority being given to those who pay for the
service
The introduction of a booking system has worked well and has been
received positively by residents with feedback including ‘The
appointment system seems to work really well - we arrived at our
appointed time and were able to drive straight in’ and
‘brilliant with the booking system in place’
Decision Maker: Assistant Director for Regulatory, Environment and Waste Services (Historic)
Decision published: 26/03/2021
Effective from: 25/03/2021
Lead officer: Marc Willimont
25/03/2021 - Approval of the expenditure of up to £27,715 from the Capital Maintenance Schools’ Budget for emergency boiler replacement works to Bredenbury School ref: 7808 Recommendations Approved
Agreement to:
1. Approve the expenditure of up to £27,515 from the
contingency allocation for the boiler works at Bredenbury School.
This includes £2,500 contingency. Responsibility for managing
and monitoring the project to be carried out by the Capital Project
Manager, within the spend budget.
2. To authorise the expenditure of up to the value of £200
for professional fees from the contingency allocation.
Responsibility for managing and monitoring the project to be
carried out by the Capital Project Manager, within the spend
budget.
3. To add this emergency works scheme to the 2020/21 maintenance
programme.
4. Bredenbury School are to self-deliver the boiler replacement
works and have provided a tender report.
Decision Maker: Assistant Director Education, Development and Skills (Historic)
Decision published: 26/03/2021
Effective from: 25/03/2021
Lead officer: Ceri Morgan
25/03/2021 - Approval the expenditure of up to £28,570 from the Capital Maintenance Schools’ Budget for Asbestos Management Surveys for Herefordshire Schools. ref: 7807 Recommendations Approved
Agreement to:
1. Award Environmental Management Solutions Ltd the contract to
complete the asbestos management survey works at Herefordshire
Schools up to the value of £26,070 to include a contingency
value of £2,370. Responsibility for managing and monitoring
the project to be carried out by the Capital Project Manager,
within the spend budget.
2. To authorise the expenditure of up to the value of £2,500
from the professional fees allocation as set out in the Cabinet
Decision. Responsibility for managing and monitoring the project to
be carried out by the Capital Project Manager, within the spend
budget.
Decision Maker: Assistant Director Education, Development and Skills (Historic)
Decision published: 26/03/2021
Effective from: 25/03/2021
Lead officer: Ceri Morgan
25/03/2021 - Decision to extend the public spaces protection order for dog control for a further 3 years ref: 7811 Recommendations Approved
In March 2018 The public spaces protection
order regarding dog fouling, keeping dogs on a lead, not putting a
dog on a lead when directed to by an officer and the exclusion of
dogs from certain areas was created and was for 3 years. Under the
legislation the council can extend the order for a further 3 years.
The issue around dog fouling is particular issue in the local
community and gives the council ability to take action where
necessary.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 26/03/2021
Effective from: 25/03/2021
Lead officer: David Hough
25/03/2021 - Postponement of Leominster and Hereford Mayfairs 2021 due to the Covid-19 outbreak ref: 7809 Recommendations Approved
To note the consensus of the HESAG group
following the meetings held on 10th March 2021, in which the
complexities and challenges of holding street fairs were discussed
and the relevant submitted event management plans, including covid
risk assessments were scrutinised.
The unprecedented significant impact of the covid-19 outbreak is
having continued ramifications across society and notably the
economy.
The COVID-19 Response - Spring 2021 – Roadmap out of Lockdown
suggests that outdoor attractions and settings including outdoor
hospitality venues and theme parks may be able to allowed to open
from 12th April 2021 at the earliest in accordance with the Health
Protection (Coronavirus, Restrictions) (Steps)
(England) Regulations 2021 which come into force on 29 March 2021.
However, any event should still be assessed on its individual
circumstances with regard to public safety from a covid
perspective.
Street fairs in Hereford and Leominster by their nature mean areas
are relatively cramped when rides and attractions are in situ,
coupled with the public in attendance also.
To hold the events at the end of April/beginning of May at a time
when society is still the process of opening up, based on the
government roadmap timetable, would mean that the covid related
risks would be uncertain and potentially still significant.
Postponing these street fairs until later in the year would mean
that the events could potentially take place if and when the covid
related risks have diminished.
Each event will once again be assessed at an appropriate lead in
time by the Herefordshire Event Safety Advisory Group who will make
a recommendation of the suitability to hold the events.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 26/03/2021
Effective from: 25/03/2021
Lead officer: Kevin Price
26/03/2021 - Car Parking Charges ref: 7750 Recommendations Approved
To consider and approve new parking charges and hours of charging to apply in council car parks and on street pay and display.
To continue with a review of parking operations, including cashless payment methods and service delivery.
Decision Maker: Cabinet member Infrastructure and transport
Decision published: 26/03/2021
Effective from: 02/04/2021
Decision:
That:
(a) Parking charges and hours of operation of council car parks and on street pay and display are amended, as shown in appendix 3, to take effect on or after 3rd May 2021 are approved;
(b) Officers to progress a further review of parking operations including cashless payment methods and service delivery, with the outcome of such review subject to a further decision to be delegated to the Director - Economy and Place, and
(c) Authority is delegated, to the Director - Economy and Place to annually decide any parking concession offered for the Christmas period in consultation with the Cabinet Member - Infrastructure.
Wards affected: (All Wards);
Lead officer: James Hughes