Decisions

Decisions

14/04/2026 - To award a Pre-Construction Services Agreement (PCSA) to Speller Metcalf Malvern Limited in the sum of £184,839.35 for the refurbishment of John Haider Building ref: 11265    Recommendations Approved

Decision Maker: Corporate Director – Economy & Environment

Decision published: 06/08/2026

Effective from: 14/04/2026

Decision:

To award a Pre-Construction Services Agreement to Speller Metcalfe in the sum of £184,839.35 for the provision of design and consultancy services to develop the design, cost, programme, and risk profile of the project, with the intention (but not obligation) of progressing to a Stage 2 Design and Build Contract.

The council have tendered this work using a compliant procurement process via the Procure Partnership framework. This is a 2 stage procurement, the first part, this Pre Construction Services Agreement (PCSA) which will to provide the detailed design of the refurbishment works, after which the contractor will submit a further bid for the final cost for the works. A further decision will be made once this bid has been received from SMML for the build cost to award the main build contract if the bid is acceptable to the council.

Lead officer: Laura Matthews


04/08/2026 - Deed of Variation to Section 278 Agreement for New Roundabout on the B4214 Bromyard Road, Ledbury for Bloor Homes ref: 11264    Recommendations Approved

Decision Maker: Officer Decisions - Economy and Enviroment

Decision published: 05/08/2026

Effective from: 04/08/2026

Decision:

For the Deed of Variation to the Section 278 Agreement for the new roundabout on the B4214, Bromyard Road, Ledbury for Bloor Homes to be signed and sealed by an authorised officer on behalf of Herefordshire Council.

To secure adopted publicly maintained highway works constructed to the proper standards for the benefit of the community.

Lead officer: Fiona Miles


03/08/2026 - Connect to Work Programme

To approve the procurement of the Connect to Work Individual Placement and Support (IPS) Programme in Herefordshire using the Open Procedure in accordance with the Procurement Act 2023. The programme is fully funded through a grant provided by the Department for Work and Pensions (DWP).
To approve the award of a contract to the bidder achieving the highest overall score against the published evaluation criteria for a period of up to three years and six months, commencing in October 2026, with a total contract value of up to £1.22 million.
To delegate operational responsibility for the delivery of the Connect to Work programme in Herefordshire to the Service Directors for Economy and Growth and Education, Skills and Learning, acting in consultation with the Cabinet Member for Economy and Growth.

Decision Maker: Cabinet member economy and growth

Decision due date: 10/09/2026

Wards affected: (All Wards);

Lead officer: Alexia Heath

Notice of decision: 03/08/2026

Anticipated restriction: Open


28/07/2026 - To approve the award of a contract for a digital financial platform to support delivery of the Crisis and Resilience Fund (CRF). ref: 11261    Recommendations Approved

Decision Maker: Corporate Director - Community Wellbeing

Decision published: 30/07/2026

Effective from: 28/07/2026

Decision:

To award a contract to eVouchers (Wonde) for the provision, implementation and ongoing support of a digital financial platform to enable delivery of the Herefordshire Crisis and Resilience Fund for the duration of the programme.

Lead officer: Nikki Stroud


23/07/2026 - To grant a lease of a new nursery building at South City Greencroft Children’s Centre ref: 11260    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 30/07/2026

Effective from: 23/07/2026

Decision:

To grant a lease of a new nursery building at South City Greencroft Children’s Centre
• The tenant has occupied space on this site for a number of years offering a valuable service in an area of high need.
• The temporary building they previously leased from the council was beyond economic repair and as a result a capital bid was made to procure and install a modern replacement.
• Terms have been agreed for a new commercial lease for a term of years.


Lead officer: Michelle Chadd


23/07/2026 - Decision to grant a tenancy at will and a lease to The Real Birth Company in respect of Unit 17, 7 Gomond Street, Maylord Orchards, Hereford. ref: 11259    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 30/07/2026

Effective from: 23/07/2026

Decision:

Decision to grant a tenancy at will and a lease to The Real Birth Company in respect of Unit 17, 7 Gomond Street, Maylord Orchards, Hereford.
1. The tenant has negotiated a deal to take the currently vacant unit.
2. The unit has been occupied sporadically over the past 24 months by temporary lettings.
3. The tenant wishes to take occupation of the property as soon as possible on a tenancy at will which will allow occupation whilst the lease is completed.
4. The proposed term is 5 years.
5. The terms agreed leave the Tenant responsible for payment of the rent, landlord Service Charge, business rates, insurance and utilities.
6. The Shopping centre comprises multiple retail units, some of which have been vacant for some time and it is important that occupation levels are maximized so that the holding costs incurred by the Council are mitigated.

Lead officer: Michelle Chadd


23/07/2026 - To grant a lease in respect of 47 Widemarsh Street, Hereford, HR4 9EA ref: 11258    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 30/07/2026

Effective from: 23/07/2026

Decision:

To grant a new lease to the current tenant of 47 Widemarsh Street
1. The tenant has negotiated a deal with the Council’s external letting agents to take a new lease of the property for a period of two years.
2. The terms agreed reflect current market conditions.
3. The grant of the new lease enables the continuation of an existing local business

Lead officer: Michelle Chadd


23/07/2026 - Grant of licence for use of land at Gaol Street, Car Park to be used as a site compound. ref: 11257    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 30/07/2026

Effective from: 23/07/2026

Decision:

To enable works to be undertaken on behalf of Herefordshire Council at a neighbouring property, John Venn building

Lead officer: Michelle Chadd


20/07/2026 - Decision to grant of Academy Lease of land and buildings at Staunton-on- Wye Endowed Primary School to Orchard Multi-Academy Trust ref: 11256    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 30/07/2026

Effective from: 20/07/2026

Decision:

Decision to grant of Academy Lease of land and buildings at
Staunton-on- Wye Endowed Primary School to Orchard Multi-Academy Trust

Lead officer: Michelle Chadd


20/07/2026 - Decision to grant of Academy Lease of land and buildings at Ewyas Harold Primary School to Orchard Multi-Academy Trust ref: 11255    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 30/07/2026

Effective from: 20/07/2026

Decision:

Decision to grant of Academy Lease of land and buildings at Ewyas Harold Primary School to Orchard Multi-Academy Trust

Lead officer: Michelle Chadd


14/07/2026 - Decision to grant a Licence for Alterations under a lease of land at Clifford Primary School ref: 11254    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 30/07/2026

Effective from: 14/07/2026

Decision:

Decision to grant a Licence for Alterations under a lease of land at Clifford Primary School
• Busy Bees Pre-School has a ground lease from the council
• They are seeking consent to add an additional small building.
• The lease requires formal landlord’s consent to any alterations.

Lead officer: Michelle Chadd


30/07/2026 - Herefordshire County Business Improvement District (HCBID) - Second Term Ballot ref: 11237    Recommendations Approved

To agree to vote ‘Yes’ in the Herefordshire County Business Improvement District (HCBID) second term ballot commencing 17 September 2026.  Should the ballot be successful, the Business Improvement District (excluding Hereford City Centre, which has an existing Business Improvement District) will implement its second, five-year term, to support the growth of the tourism and retail sectors across Herefordshire.

 

Decision Maker: Cabinet member economy and growth

Decision published: 30/07/2026

Effective from: 06/08/2026

Decision:

That:

a)    the Director for Growth be authorised to vote in favour of the Herefordshire County Business Improvement District on behalf of the council; and

b)    should the outcome of the ballot support the second, five-year term of Herefordshire County BID, approve the payment of the levy, on liable properties in the council’s ownership, calculated to be £21,398.13 per annum, for a period of five years.

 

Wards affected: (All Wards);

Lead officer: Nadine Kinsey


15/07/2026 - Decision to approve the expenditure of up to £348,000 for the capital roofing upgrade works at Aylestone School, Herefordshire ref: 11253    Recommendations Approved

Decision Maker: Service Director - Education, Skills and Learning

Decision published: 30/07/2026

Effective from: 15/07/2026

Decision:

The current Schools Capital Maintenance Programme is to be amended to include the emergency capital roofing upgrade works at the CDT Block, Aylestone School. This follows receipt of an updated condition report confirming that the roof has deteriorated to a level requiring immediate refurbishment to prevent further deterioration and associated risks. The CDT Block roofing upgrade works to commence at the beginning of the school summer holidays 2026. Herefordshire Council to direct award a contract to supplier Central Roofing and Building Services Limited. Approve the expenditure of up to £312,330 for the works, which
includes a contingency of up to £28,400. Approve the expenditure of up to £35,500 for internal and external professional fees. Responsibility for monitoring the programme to be carried out by the Capital Senior Project Manager within the spend budget

Lead officer: Rhiannon Pailing


30/07/2026 - Corporate Peer Challenge Progress Review ref: 11243    Recommendations Approved

To receive the report on the outcome of the Local Government Association Corporate Peer Challenge Progress Review, held on 28 May 2026, and to endorse the continued delivery of the council’s action plan in response to the original recommendations.

Decision Maker: Cabinet

Made at meeting: 30/07/2026 - Cabinet

Decision published: 30/07/2026

Effective from: 06/08/2026

Decision:

That: a) Cabinet receives and notes the report arising from the Local Government Association Corporate Peer Challenge Progress Review held on 28 May 2026; and

b) Cabinet endorses the continued delivery of the council’s action plan in response to the original recommendations.

Wards affected: (All Wards);

Lead officer: Hilary Hall, Caroline Marshall


30/07/2026 - Food Waste Collection Implementation ref: 11245    Recommendations Approved

Following the successful award and mobilisation of the new recyclables and waste collection service, Cabinet resolved to approve the introduction of the new food waste collections scheme in May 2025. This report recommends the optimal approach to implementing this scheme and sets out the rationale for this recommendation against other potential options.

Decision Maker: Cabinet

Made at meeting: 30/07/2026 - Cabinet

Decision published: 30/07/2026

Effective from: 06/08/2026

Decision:

That: a) Cabinet approves the commencement of a new food waste collection service from September 2027 as a countywide service implementation;

b) Cabinet authorises the revenue expenditure detailed in paragraphs 49 and 50 to mobilise the service,

c) Cabinet authorises the capital expenditure detailed in in paragraphs 43 and 50, to purchase and deliver the new food containers and caddy liners and to undertake the required depot improvements works;

d) Cabinet delegate all operational decisions to implement the above recommendations to the Chief Operating Officer - Economy and Environment.

Wards affected: (All Wards);

Lead officer: Sabrina Entwistle, Nicola Percival


30/07/2026 - Children’s Services Statutory Direction ref: 11241    Recommendations Approved

The purpose of this report is to present Cabinet with the outcome of the Inspection of Local Authority Children Services (ILACS) which took place 10-21 November 2025 and published 12 January 2026 and provide the DfE update on the statutory direction to Herefordshire LA (appendix A).

Decision Maker: Cabinet

Made at meeting: 30/07/2026 - Cabinet

Decision published: 30/07/2026

Effective from: 06/08/2026

Decision:

That a) Cabinet note the improvement made in Children’s Services and the positive report completed by the DFE appointed commissioner; and

b) Cabinet note the formal lifting of the statutory direction placed on Children’s Services.

Wards affected: (All Wards);

Lead officer: Diane Kennett


30/07/2026 - Big Economic Plan ref: 11242    Recommendations Approved

To consider and approve the Big Economic Delivery Plan

Decision Maker: Cabinet

Made at meeting: 30/07/2026 - Cabinet

Decision published: 30/07/2026

Effective from: 06/08/2026

Decision:

That: a) Consider and approve the Big Economic Delivery Plan

b) To delegate to the Director for Growth, in consultation with the Cabinet Member for Economy and Growth, the ability to make any final minor amendments to the Economic Delivery Plan in finalising for publication

c) To delegate to the Director for Growth, in consultation with the Cabinet Member for Economy and Growth, any operational decisions required to implement the Plan.

Wards affected: (All Wards);

Lead officer: Nadine Kinsey


30/07/2026 - CQC Assessment report and Improvement plan ref: 11238    Recommendations Approved

The purpose of this report is to present Cabinet with the outcome of the Care Quality Commission (CQC) Assessment and to approve Herefordshire's CQC Assurance improvement plan 2026-27

Decision Maker: Cabinet

Made at meeting: 30/07/2026 - Cabinet

Decision published: 30/07/2026

Effective from: 06/08/2026

Decision:

That:

a) Cabinet notes the outcome of the Herefordshire CQC Assessment;

b) Cabinet approves Herefordshire’s CQC Assurance improvement plan 2026-2027;

c) Cabinet authorises the Corporate Director Community Wellbeing to lead this improvement plan on behalf of the Council and to take all operational decisions, as set out within this report and appendices.

Wards affected: (All Wards);

Lead officer: Emma Evans, Hilary Hall


30/07/2026 - Herefordshire Parking Strategy 2026 - 2041 ref: 11244    Recommendations Approved

A report on the proposed 15 year strategy for parking to be adopted by Herefordshire Council.

Decision Maker: Cabinet

Made at meeting: 30/07/2026 - Cabinet

Decision published: 30/07/2026

Effective from: 06/08/2026

Decision:

That: a) That the new Parking Strategy for Herefordshire is adopted by cabinet;

b) Delegated authority be given to the Chief Operating Officer for Economy and Environment in consultation with the Cabinet Member for Roads and Regulatory Services to take all operational decisions to implement the Parking Strategy and its delivery plan.

Wards affected: (All Wards);

Lead officer: Ffion Horton


29/07/2026 - 163932 - LAND AT HARDWICK BANK, BROMYARD, HEREFORDSHIRE ref: 11252    Recommendations Approved

Decision Maker: Planning and Regulatory Committee

Made at meeting: 29/07/2026 - Planning and Regulatory Committee

Decision published: 29/07/2026

Effective from: 29/07/2026

Decision:

Application refused in accordance with the case officer’s recommendation.

 

Wards affected: Bromyard West;


28/07/2026 - Renewal of Access Group contract for Mosaic, Synergy and associated systems

To seek approval to enter into a new contractual arrangement with The Access Group for the continued provision of Mosaic, Synergy, Core+ and associated systems, including transition to Access' cloud-hosted (SaaS) service, following expiry of the current contract's available extensions in September 2026.

Decision Maker: Cabinet member adults, health and wellbeing

Decision due date: 25/09/2026

Wards affected: (All Wards);

Lead officer: Hilary Hall

Notice of decision: 28/07/2026

Anticipated restriction: Open


27/07/2026 - Early Help Task and Finish Group - final report

To provide Cabinet with the final report of the Children and Young People Scrutiny Committee's Early Help task and group, looking at the provision of early help in Herefordshire.

Decision Maker: Cabinet

Decision due date: 22/10/2026

Wards affected: (All Wards);

Lead officer: Danial Webb

Notice of decision: 27/07/2026

Anticipated restriction: Open


24/07/2026 - National Parking Platform (NPP) ref: 11233    Recommendations Approved

This report seeks approval for the Council to join the National Parking Platform (NPP).

Decision Maker: Cabinet member roads and regulatory services

Decision published: 24/07/2026

Effective from: 31/07/2026

Decision:

That:

a) The Cabinet member approves the Council entering into a contract with the National Parking Platform (NPP), and

b) Delegates all operational and financial decisions to the Chief Operating Officer - Resident Services to progress the council’s application to join the NPP.

Wards affected: (All Wards);

Lead officer: Michael Barnes


15/07/2026 - Decision to grant a Licence for Alterations to land at Marden Primary Academy ref: 11251    Recommendations Approved

Decision Maker: Service Director Economy and Growth

Decision published: 23/07/2026

Effective from: 15/07/2026

Decision:

Decision to grant a Licence for Alterations to land at Marden Primary Academy
• Marden Primary Academy has a 125 year lease from the council and the lease requires landlord’s consent to any alterations.

Lead officer: Michelle Chadd


20/05/2026 - Contract Award for City and Market Town Public Realm Investment – WO3 ref: 11250    Recommendations Approved

Decision Maker: Corporate Director – Economy & Environment

Decision published: 23/07/2026

Effective from: 20/05/2026

Decision:

To award the Market Town Funding works in various Market Towns
(Works Order 3) contract to Tarmac Trading using the councils Highways
and Public Realm Schemes Framework, up to the value of £287,296.61
with an approved contingency of 10% to the value of £28,729.66

Lead officer: Jenny Arnold


20/05/2026 - Award of contract for resurfacing works of various sites – Works Order 46 ref: 11249    Recommendations Approved

Decision Maker: Service Director – Environment , Highways, & Waste

Decision published: 23/07/2026

Effective from: 20/05/2026

Decision:

To award a contract (Works Order 46) to Tarmac Trading Ltd using the
Council’s Highways and Public Realm Schemes Framework, to the initial
value of £411,493.99 for resurfacing works and 10% contingency as set
out in Appendix 1.

Lead officer: Jenny Arnold


24/04/2026 - Award of highway works associated with Highway Infrastructure Investment – Works Order 45 ref: 11248    Recommendations Approved

Decision Maker: Service Director – Environment , Highways, & Waste

Decision published: 23/07/2026

Effective from: 24/04/2026

Decision:

To award a contract (Works Order 45) to Tarmac Trading Ltd using the
Council’s Highways and Public Realm Schemes Framework, to the initial
value of £547,444.78 for resurfacing works and 10% contingency as set out in Appendix 1.

Lead officer: Jenny Arnold


20/05/2026 - Award of contract for pre surface dressing patching works of various sites – Works Order 44 ref: 11247    Recommendations Approved

Decision Maker: Service Director – Environment , Highways, & Waste

Decision published: 23/07/2026

Effective from: 20/05/2026

Decision:

To award a contract (Works Order 44) to Tarmac Trading Ltd using the
Council’s Highways and Public Realm Schemes Framework, to the initial
value of £436,921.86 for surface dressing preparation works and 10%
contingency on various classifications of roads across the county, as set out in Appendix 1.

Lead officer: Jenny Arnold


23/07/2026 - Recommissioning of Family Help Service

This report seeks approval to recommission the Family Help Service through an open procurement process. The existing contract is due to end on 31 March 2027 and a recommissioned service is required to support the council's Family Help offer, deliver early intervention and prevention services, and improve outcomes for children, young people and families

Decision Maker: Cabinet member children and young people

Decision due date: 01/09/2026

Wards affected: (All Wards);

Lead officer: Sandra Griffiths

Notice of decision: 23/07/2026

Anticipated restriction: Open


18/06/2026 - To make provisional Tree Preservation Order 711 Land adjacent to Wyson Avenue, Brimfield, Ludlow ref: 11246    Recommendations Approved

Decision Maker: Officer Decisions - Economy and Enviroment

Decision published: 23/07/2026

Effective from: 18/06/2026

Decision:

To serve a provisional TPO

Lead officer: Ruth Jackson


15/07/2026 - Decision to award contract and approve the expenditure of up to £296,585.00 for the transfer of modular accommodation units from Peterchurch Primary School to Weobley High School, Hereford. ref: 11240    Recommendations Approved

Decision Maker: Service Director - Education, Skills and Learning

Decision published: 23/07/2026

Effective from: 15/07/2026

Decision:

Award a contract to SC Joseph for the relocation of modular accommodation units from Peterchurch Primary school to Weobley High School, Weobley, Herefordshire, HR4 8ST, following a successful tender on the Council’s procurement portal.

Approve the expenditure of up to £235,585 for the works, which includes a contingency of up to £19,235

Approve the expenditure of up to £61,000 for internal and external
professional fees.

Responsibility for monitoring the Programme to be carried out by the Capital Project Manager within the budget.

Lead officer: Annie Ahearne


24/06/2026 - Decision to award a contract to Morris Vermaport (MV Lifts) Ltd and approve the expenditure of up to £107,266.13 for lift replacement at Town Hall, Hereford ref: 11239    Recommendations Approved

Decision Maker: Corporate Director – Economy & Environment

Decision published: 23/07/2026

Effective from: 24/06/2026

Decision:

Award a contract to Morris Vermaport (MV Lifts) Ltd for lift replacement
works at Town Hall, St Owens Street, Hereford. HR1 2PJ following a
successful tender exercise.

Approve the expenditure of up to £98,379.57 for the works.

Approve the expenditure of up to £6,886.56 for contingency

Approve the expenditure of up to £2,000 for internal and external
professional fees.

The Corporate Director, Economy and Environment approve the delegated authority to the Service Director to take all operational decisions relating to the award of contracts for the 2025-2028 Capital Programme.

Authority is delegated to the Capital Project Manager from the
Corporate Director of Economy and Environment to act as spend manager for the project. Responsibility for monitoring the remaining works to be carried out by the Capital Project Manager within the spend budget.

Lead officer: Annie Ahearne