14/01/2020 - Street naming and numbering charges ref: 6511 Recommendations Approved
The council has a statutory duty to provide a street naming and numbering (SNN) service. Over the years the use of electronic address data has increased the demand on the service and the role undertaken. The service currently provided therefore has evolved to include statutory and discretionary elements.
Through the registration and distribution of new addresses and postcodes, developers receive a service which is of clear commercial value to them. Without an address they have difficulties procuring service connections and processing property sales. Their customers, the purchasers of the properties, would in turn have difficulty accessing a range of services after they move in as their address will not appear on any database or mapping system. As a general principle there is greater acceptance of charges where a clear benefit is visible in return.
This report is looking at introducing a scheme of charges on the discretionary element of the work, it will summarise the SNN legislation, look at the reasoning and explore available options. A scheme of charges (appendix A) is proposed which will aim to recover the cost of the discretionary element of the work, thus helping to maintain service delivery.
Decision Maker: Assistant Director for Technical Services
Decision published: 03/01/2020
Effective from: 21/01/2020
Decision:
That:
the scheme of charges (appendix A) for additional discretionary street naming and numbering services be introduced with effect from 1 April 2020.
Wards affected: (All Wards);
Lead officer: Natalia Thomas-Alvarez
19/12/2019 - Procurement of Occupational Health Services for Herefordshire Council employees ref: 6433 Recommendations Approved
The purpose of this report is to agree arrangements for providing Occupational Health Services specifically for employees of Herefordshire Council with effect from 1 April 2020.
Herefordshire Council has offered Occupational Health Services (including physiotherapy and counselling) to its employees for several years. These services have been delivered through a third-party contract and will expire on 31 March 2020.
The council seeks to promote and maintain the health and wellbeing of its employees, with the goal being to ensure a positive relationship between an employee’s work and health. The council recognises that there are many benefits to occupational health; managing the health and wellbeing of people at work and having access to specialist occupational health practitioners is key to unlocking these benefits.
Decision Maker: Chief executive
Decision published: 19/12/2019
Effective from: 31/12/2019
Decision:
That:
(a) A procurement exercise is undertaken to award a contract, for up to five years, to deliver Occupational Health Services on behalf of Herefordshire Council. The total contract value is estimated to be £125,000 over five years; and
(b) The Assistant Director for People is authorised to take all operational decisions necessary to implement the above.
Wards affected: (All Wards);
Lead officer: Lorna Simpson
13/12/2019 - Adoption of the Whitchurch and Ganarew neighbourhood plan and consequential updates to the countywide policies map ref: 6482 Recommendations Approved
To make the Whitchurch and Ganarew Group neighbourhood development plan as part of the statutory development plan for Herefordshire and approve the consequential updates to the countywide policies maps.
To fulfil the legal duty to make /adopt the Whitchurch and Garanew Group neighbourhood development plan and update the countywide policies map as part of the statutory development plan for Herefordshire.
Herefordshire has positively supported communities to be involved in producing a neighbourhood development plan and currently has the greatest number being produced in a local authority area within England.
There are currently 112 plans being produced in Herefordshire (67 of which have now been Made) by parish councils and their local communities. These neighbourhood development plans will provide more locally detailed policies to support the delivery of the Herefordshire Local Plan – Core Strategy and guide development within the local parish until 2031
On 20 May 2016, the Council delegated authority to the cabinet member infrastructure for decisions on all further neighbourhood development plans adoptions, and consequential amendments to the countywide policies map.
Decision Maker: Cabinet member Infrastructure and transport
Decision published: 13/12/2019
Effective from: 20/12/2019
Decision:
That:
(a) The Whitchurch and Ganarew Group neighbourhood development plan is made as part of the statutory development plan for Herefordshire; and
(b) The required consequential changes are made to the countywide policies map.
Wards affected: Kerne Bridge;
Lead officer: Samantha Banks
24/10/2019 - Annual review of earmarked reserves ref: 6389 Recommendations Approved
To note and approve the annual earmarked reserves review.
Earmarked reserves are established to hold revenue balances to fund future year commitments over and above the annual budget requirement. They generally arise where funding exceeds expenditure, usually due to the timing of receipts being ahead of incurring expenditure. As a matter of good practice a review is undertaken each year to establish the continued need for reserves held for earmarked purposes to ensure resources can be used to best effect whilst maintaining a prudent level of reserves to meet future anticipated commitments.
Decision Maker: Cabinet
Decision published: 24/10/2019
Effective from: 31/10/2019
Decision:
That
The following changes be made to the reserve balances held, as shown in appendix 1:
i. Establish a new earmarked reserve of £150k, utilising funds held in the financial resilience reserve, to fund the investigation of different models of delivering council housing; and
ii. Establish a new ear marked reserve of £550k, utilising funds held in the financial resilience reserve, to fund the initial implementation in 2019/20 of an enhanced edge of care service for young people and support a high quality children’s social care service.
Wards affected: (All Wards);
Lead officer: Josie Rushgrove
24/10/2019 - Corporate Parenting Annual Update 2018/2019 ref: 6387 Recommendations Approved
To review the progress of the corporate parenting strategy. |
Decision Maker: Cabinet
Decision published: 24/10/2019
Effective from: 31/10/2019
Decision:
That: the progress of the corporate parenting strategy as outlined at appendix 1 to the report was considered and cabinet did not identify any further actions required to improve the delivery of the strategy
|
Wards affected: (All Wards);
Lead officer: Gill Cox
24/10/2019 - Fostering and Adoption Service Annual Reports 2018/19 ref: 6388 Recommendations Approved
To review Adoption and Fostering Services performance and approve related documents.
Decision Maker: Cabinet
Decision published: 24/10/2019
Effective from: 31/10/2019
Decision:
That:
(a) The performance of the adoption service as outlined at appendix 1 to the report was reviewed, no additional risks to achievement of objectives were noted and no further mitigating actions were required; and
(b) The performance of the fostering service as outlined at appendix 2 to the report was reviewed, no additional risks to the achievement of objectives were noted and no further mitigation actions were required.
Wards affected: (All Wards);
Lead officer: Gill Cox
03/10/2019 - Award of temporary subsidy to bus service 420 Worcester to Bromyard ref: 6400 Recommendations Approved
Decision Maker: Director of Economy and Place (Historic)
Decision published: 24/10/2019
Effective from: 03/10/2019
Decision:
1. Award temporary bus subsidy to the 420
service operating between Worcester and Bromyard from 14th October
2019 to 31st December 2019 at a cost of £1,361.
Lead officer: Steve Burgess
01/10/2019 - Award of SEN Transport Contracts – September 2019 ref: 6399 Recommendations Approved
Decision Maker: Director of Economy and Place (Historic)
Decision published: 24/10/2019
Effective from: 01/10/2019
Decision:
The decision has been taken to:
1. Award SEN school transport contracts as detailed below.
Contract BFD192S – Barrs Court School. Awarded to High Town
Taxis for a maximum 5 year term commencing 4th September 2019 at a
total annual value of £19,110. 3 compliant bids were
received. This contract is required to provide transport for a LAC
child who was subject to an emergency placement.
Contract LSM191S – Llangattock School. Awarded to Simons
Taxis for a 1 year term 12th September 2019 at a total annual value
of £10,920, 4 compliant bids were received. This is an
additional contract required to provide statutory school
transport.
The net effect of tendering these contracts will see an increase in
transport contracting costs of £9,750, adding to the forecast
overspend on SEN transport of £408k.
Lead officer: Steve Burgess
23/10/2019 - Update on reducing the number of looked after children (LAC) Recommendations Approved
To provide an update concerning efforts to
reduce the number of looked after children (LAC).
Decision Maker: Children and Young People Scrutiny Committee
Decision due date: 25/11/2019
Wards affected: (All Wards);
Lead officer: Liz Elgar
Notice of decision: 23/10/2019
Anticipated restriction: Open
04/10/2019 - Decision to Prosecute Two individuals for Failing to Secure Regular Attendance of Their Child At School. Leominster South. 04.10.19 ref: 6395 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 22/10/2019
Effective from: 04/10/2019
Decision:
To prosecute two defendants for failing to
secure the attendance of a compulsory school age registered child
between 4th February 2019 to 2nd April 2019, contrary to Section
444(1) of the Education Act 1996, using the Single Justice
Procedure.
Lead officer: Elizabeth Fletcher
22/10/2019 - Cisco Network Maintenance for Equipment Purchased prior to 2017 ref: 6394 Recommendations Approved
Decision Maker: Assistant director Corporate Support (Historic)
Decision published: 22/10/2019
Effective from: 22/10/2019
Decision:
Award a contract to CAE Technology Services
for the provision of cisco equipment maintenance and support for a
period of 4 months at a total cost of £33,605.
Lead officer: Natalia Silver
22/10/2019 - Hereford Transport Package & South Wye Transport Package ref: 6398 Implemented
To determine future actions regarding the Hereford Transport Package (HTP), which includes the Hereford bypass and associated active travel measures and South Wye Transport Package (SWTP), which includes the southern link road and local active travel measures comprising walking, cycling, bus and public realm improvements.
The original decision to pause and review the bypass and southern link road taken by the cabinet member for infrastructure and transport was taken on 9 August 2019. The decision was called in by General Scrutiny Committee. The decision was discussed at a meeting of the committee on 9 September 2019 and the committee came to the view that the decision should be referred back to the cabinet member to reconsider, giving regard to the matters set out in paragraph 34 below.
This report confirms the final decision having regard to the recommendations made by General Scrutiny Committee.
Decision Maker: Cabinet member Infrastructure and transport
Decision published: 22/10/2019
Effective from: 22/10/2019
Decision:
THAT, having regard to the recommendations made by General Scrutiny Committee on 9 September 2019:
(a) a review of the South Wye Transport Package be undertaken to determine next steps, and work on the Southern Link Road and active travel measures (the scope of which will be determined in a further report and be subject to the agreement of funders to draw down funding or provision being made within the capital programme) is continued whilst the review is undertaken;
(b) a review of the bypass project to determine next steps be undertaken, and work on the Hereford Transport package active travel measures and the other bypass work as listed below is continued whilst the review is undertaken;
Phase 2a consultation report completion |
£12,000 |
Geophysical survey report completion |
£3,000 |
Ground Investigation Report (GIR) completion |
£6,000 |
Walking and Cycling (WCHAR) assessment completion |
£5,000 |
Traffic Modelling |
£22,000 |
Large Local Major Bid completion |
£18,000 |
(c) discussions continue with funding organisations to clarify the funding implications of a review and to seek to minimise the risk of loss of any secured funding;
(d) consultation with parish councils, businesses and members of the public be included within the scope of the review;
(e) the acting director for economy and place be authorised to take all operational decisions necessary to scope the review work for both road schemes within a budget of £50k (Southern Link Road) and £70k (Hereford By-pass) to inform a further decision in this calendar year on the scope of the review to be undertaken; and
(f) the acting director for economy and place be authorised to take all operational decisions necessary to undertake the bypass work listed in recommendation (b) above within a budget envelope of £66,000 and to approve variance between the activities within a tolerance of £5,000.
Wards affected: (All Wards);
Lead officer: Mairead Lane
21/10/2019 - Director of Public Health Annual Report
To inform the Health and Wellbeing Board of
the publication of the independent report of the Director of Public
Health.
To recommend that the Health and Wellbeing Board supports the
implementation of the recommendations of the report.
Decision Maker: Health and Wellbeing Board
Decision due date: 09/12/2019
Wards affected: (All Wards);
Lead officer: Rebecca Howell-Jones
Notice of decision: 21/10/2019
Anticipated restriction: Open
21/10/2019 - Draft SACRE Annual Report for the Academic Year September 2018 – July 2019
To approve the draft SACRE Annual Report for
the academic year September 2018 to July 2019.
Decision Maker: Standing Advisory Council for Religious Education (SACRE)
Decision due date: 29/11/2019
Wards affected: (All Wards);
Lead officer: Matthew Evans
Notice of decision: 21/10/2019
Anticipated restriction: Open
21/10/2019 - Guidance for the agreed syllabus conference Recommendations Approved
To consider the results of the consultation conducted with teachers in respect of the religious education syllabus options and agree which option to progress.
Decision Maker: Standing Advisory Council for Religious Education (SACRE)
Decision due date: 29/11/2019
Wards affected: (All Wards);
Lead officer: Matthew Evans
Notice of decision: 21/10/2019
Anticipated restriction: Open
22/08/2019 - Revocation of trading consent at Layby pitch A49 Much Birch ref: 6393 Recommendations Approved
Decision Maker: Assistant Director for Technical Services
Decision published: 21/10/2019
Effective from: 22/08/2019
Decision:
To revoke a trading consent at Layby pitch A49
Much Birch
Lead officer: Kevin Price
11/10/2019 - Review of Polling Districts, Polling Places and Polling Stations ref: 6390 Recommendations Approved
To approve a new scheme of polling districts, polling places and polling stations.
The council has a duty to divide its area into Polling Districts and to designate Polling Places for each district and review these every 5 years.
The review is designed to see if the polling districts and polling places in Herefordshire are arranged to suit the needs of voters and covers the following:
· the polling district boundaries within each ward in the borough
· the location of the polling places and stations in each polling district
· the access to each polling station
The council cannot review the ward boundaries or the constituency boundaries.
As a result of the review we are not proposing changes to polling districts or places but there are some changes to polling stations proposed.
Decision Maker: Chief executive
Decision published: 21/10/2019
Effective from: 11/10/2019
Decision:
That:
1) no changes be made to the existing Polling Districts as set out in appendix A;
2) each entire Polling District continues to be designated as the Polling Place for that Polling District; and
3) Changes to the following polling stations (as detailed at appendix A) be approved:
The Whitehouse Community Hub
Garway Community Centre
Westfields Hall
The Kinnersley Arms
Winforton Community Hall
The Forge
The Gateway Centre
Riverside Primary School
Kington Town Football Club
Ledbury Community Hall
Christ Church
Holy Trinity Church
Eastnor Cricket Club
Ledbury Swimming Pool
The Garron Centre
The Belmont Community Centre
The Three Counties Hotel
Weston-under-Penyard Village Hall
Larruperz Community Centre
Ross Swimming Pool
Ross-on-Wye Rugby Club
Wards affected: (All Wards);
Lead officer: Amy Hallett
17/10/2019 - Review of governance models Recommendations Approved
To agree arrangements and the timetable for
undertaking review of governance models in compliance with a
resolution passed by Council on 11 October 2019.
Decision Maker: Audit and Governance Committee
Decision due date: 19/11/2019
Wards affected: (All Wards);
Lead officer: Annie Brookes
Notice of decision: 17/10/2019
Anticipated restriction: Open
16/10/2019 - 182607 - LAND NORTH OF THE CORNER HOUSE, TEMPLE LANE, LITTLE HEREFORD CROSSING ref: 6385 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 16/10/2019 - Planning and Regulatory Committee
Decision published: 16/10/2019
Effective from: 16/10/2019
Decision:
The application was refused contrary to the Case Officer’s recommendation.
Wards affected: Leominster North and Rural;
16/10/2019 - 190032 - LAND TO THE WEST OF B4361, LUSTON, HEREFORDSHIRE ref: 6384 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 16/10/2019 - Planning and Regulatory Committee
Decision published: 16/10/2019
Effective from: 16/10/2019
Decision:
This application was withdrawn from the agenda.
Wards affected: Bircher;
16/10/2019 - 191288 - Land at OAKLAND'S PADDOCK, LANGSTONE LANE, LLANGARRON ref: 6382 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 16/10/2019 - Planning and Regulatory Committee
Decision published: 16/10/2019
Effective from: 16/10/2019
Decision:
The application was approved in accordance with the Case Officer’s recommendation.
Wards affected: Llangarron;
16/10/2019 - 184593 - WOODMILL COTTAGE, OCHRE HILL, WELLINGTON HEATH, LEDBURY, HR8 1LZ ref: 6386 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 16/10/2019 - Planning and Regulatory Committee
Decision published: 16/10/2019
Effective from: 16/10/2019
Decision:
The application was approved in accordance with the Case Officer’s recommendation, with an amended condition as reflected in the schedule of updates.
Wards affected: Ledbury North;
16/10/2019 - 191330 - LAND TO THE NORTH WEST OF IVY COTTAGE, GARWAY COMMON, GARWAY ref: 6383 Recommendations Approved
Decision Maker: Planning and Regulatory Committee
Made at meeting: 16/10/2019 - Planning and Regulatory Committee
Decision published: 16/10/2019
Effective from: 16/10/2019
Decision:
The application was approved in accordance with the Case Officer’s recommendation, with an additional provision relating to the access.
Wards affected: Birch;
16/09/2019 - Decision to Issue A CPN To An Individual For Not Clearing Fly Tipped Waste From Their Land. Leominster West. 16.09.19 ref: 6380 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 15/10/2019
Effective from: 16/09/2019
Decision:
To issue formal community protection notice in
accordance with Section 43 of the Anti-Social Behaviour Crime and
Policing Act 2014.
Lead officer: Elizabeth Fletcher
15/07/2019 - Decision to Grant A PGI Certificate of Conformity to Aston Manor Ltd. Out of County. 15.07.19 ref: 6379 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 15/10/2019
Effective from: 15/07/2019
Decision:
To grant a Protection of Geographical
Indication Certificate of Conformity to Aston Manor Ltd, Nelsons
Wharf, Sandy Lane, Stourport on Severn, Worcestershire, DY13 9QB
for two Cider products under Council Regulations (EEC) Number
1151/2012.
Lead officer: Elizabeth Fletcher
03/10/2019 - Decision To Grant A PGI Certificate of Conformity to Pips Cider Ltd. Dorstone. 03.10.19 ref: 6378 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 15/10/2019
Effective from: 03/10/2019
Decision:
To grant a Protection of Geographical
Indication Certificate of Conformity to Pips Cider Ltd, Mill
Cottage, Dorstone, Herefordshire, HR3 6BN for three cider products
under Council Regulations (EEC) Number 1151/2012.
Lead officer: Elizabeth Fletcher
11/10/2019 - Adoption of the Withington Group neighbourhood plan and consequential updates to the countywide policies map ref: 6318 Recommendations Approved
To make the Withington Group neighbourhood development plan as part of the statutory development plan for Herefordshire and approve the consequential updates to the countywide policies maps.
To fulfil the legal duty to make /adopt the Withington Group neighbourhood development plan and update the countywide policies map as part of the statutory development plan for Herefordshire.
On 20 May 2016, the Council delegated authority to the cabinet member infrastructure for decisions on all further neighbourhood development plans adoptions, and consequential amendments to the countywide policies map.
Decision Maker: Cabinet member Infrastructure and transport
Decision published: 11/10/2019
Effective from: 18/10/2019
Decision:
That:
(a) The Withington Group neighbourhood development plan is made as part of the statutory development plan for Herefordshire; and
(b) The required consequential changes are made to the countywide policies map.
Wards affected: Hagley;
Lead officer: Samantha Banks
11/10/2019 - Adoption of the Weobley neighbourhood plan and consequential updates to the countywide policies map ref: 6317 Recommendations Approved
To make the Weobley neighbourhood development plan as part of the statutory development plan for Herefordshire and approve the consequential updates to the countywide policies maps.
To fulfil the legal duty to make /adopt the Weobley neighbourhood development plan and update the countywide policies map as part of the statutory development plan for Herefordshire.
On 20 May 2016, the Council delegated authority to the cabinet member infrastructure for decisions on all further neighbourhood development plans adoptions, and consequential amendments to the countywide policies map.
Decision Maker: Cabinet member Infrastructure and transport
Decision published: 11/10/2019
Effective from: 18/10/2019
Decision:
That:
(a) The Weobley neighbourhood development plan is made as part of the statutory development plan for Herefordshire; and
(b) The required consequential changes are made to the countywide policies map.
Wards affected: Weobley;
Lead officer: Samantha Banks
10/10/2019 - Service of notice under Section 154, Highways Act 1980 – tree/shrub growing on land adjacent to Faraday Road, Hereford ref: 6376 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 10/10/2019
Effective from: 10/10/2019
Decision:
That notice under Section 154, Highways Act
1980, is served on the occupier of land on which a tree/shrub
adjacent to Faraday Road, Hereford is overhanging the footpath to
an extent so as the obstruct the free passage of pedestrians, such
notice to require the occupier to cut the tree/shrub so as to
remove the obstruction within such time as specified in the
notice.
Lead officer: Bruce Evans
10/10/2019 - Service of notice under Section 154, Highways Act 1980 – hedge/shrub growing on land adjacent to Greyfriars Avenue, Hereford ref: 6375 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 10/10/2019
Effective from: 10/10/2019
Decision:
That notice under Section 154, Highways Act
1980, is served on the occupier of land on which a hedge/shrub
adjacent to Greyfriars Avenue, Hereford is overhanging the footpath
to an extent so as the obstruct the free passage of pedestrians,
such notice to require the occupier to cut the hedge/shrub so as to
remove the obstruction within such time as specified in the
notice.
Lead officer: Bruce Evans
10/10/2019 - A4113, High Street, Leintwardine, Herefordshire Temporary Road Closure Order 2019 ref: 6374 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 10/10/2019
Effective from: 10/10/2019
Decision:
To authorise the making of a Temporary Road
Closure Order served under section 14(1) of the Road Traffic
Regulation Act 1984 to require a temporary closure on the A4113,
High Street, Leintwardine, from outside 32 - 43 High Street,
planned to be effective for a period of 1 day commencing on the
15th of November 2019.
Lead officer: Bruce Evans
10/10/2019 - U80005 East Street, Hereford, Herefordshire- Preparation of a Temporary Suspension of a One-Way Restriction Order made under section 14(1) of the Road Traffic Regulations Act 1984 (as amended) ref: 6373 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 10/10/2019
Effective from: 10/10/2019
Decision:
To authorise the making of a Temporary
Suspension of a One-Way Restriction Order served under section
14(1) of the Road Traffic Regulation Act 1984 to require a
temporary suspension of the U80005 East Street, Hereford,
Herefordshire. The Order shall come into effect on the 26th October
2019 and is planned to be in effect for 11 days.
Lead officer: Bruce Evans
10/10/2019 - Revised Hereford (Rotherwas) Enterprise Zone Local Development Order 2019 ref: 6313 Recommendations Approved
To approve and adopt the revised Hereford (Rotherwas) Enterprise Zone Local Development Order 2019 (Appendix 2), to include additional areas of land to the south and east of the Enterprise Zone and roll forward its operation for a further period. The LDO process has been fundamental to the success of the Hereford Enterprise Zone by providing certainty for investors and is the only incentive now available to investors. Bringing forward a revised LDO indicates the Council’s continuing support for providing employment land within Enterprise Zone. The process has also enabled the Rotherwas Drainage and Flood Management Strategy to be revisited in the light of Environment Agency advice regarding updated climate change guidance for flood risk reduction. The benefits of the LDO will outweigh the loss of any fee income and the process has helped to enable an increased rate of industrial development at the enterprise zone. Since it has been in operation over £48m has been invested in those projects with Council receipts from sales totalling almost £3m and developments built or underway generating £21 m of business rates.
Decision Maker: Director of Economy and Place (Historic)
Decision published: 10/10/2019
Effective from: 17/10/2019
Decision:
That:
(a) Hereford (Rotherwas) Enterprise Zone Local Development Order 2019 be approved and adopted.
Wards affected: Dinedor Hill;
Lead officer: Kevin Singleton
10/10/2019 - Short Breaks Capital Grant Scheme ref: 6314 Recommendations Approved
To approve the creation of a short breaks capital grant scheme. |
Short breaks provide opportunities for disabled children and young people to have enjoyable experiences away from their primary carers, thus contributing to their social inclusion and personal and social development. They also provide the parents and carers of disabled children with a necessary and valuable break from their caring responsibilities.
Feedback from families highlighted that children wanted to access more activities alongside other children, to increase socialisation, and that support currently provided, whilst meeting a number of key outcomes, may limit opportunity for increasing levels of independence for some children.
The grant scheme will ensure maximum benefit for children with disabilities and special educational needs across Herefordshire, approved at the council’s budget meeting on 15 February 2019 as part of the council’s capital strategy. The aim of the scheme is to improve access to universal and targeted activities across Herefordshire for children with special educational needs and disabilities by delivering capital improvements, thus creating greater opportunity for spending time with friends, and developing independence.
The maximum capital funding available for this scheme is £118,000, which is non-recurrent. It is intended that all funding will be committed by the end of March 2020. If required, further bidding rounds will be scheduled during 2020 until the budget has been fully allocated.
The funding will be used for capital projects that support the provision of regular, inclusive universal and targeted activities to support children and young people with special educational needs and disabilities in Herefordshire.
Wide publicity and awareness through existing networks will be undertaken to ensure that eligible organisations are given the opportunity to apply and demonstrate that their project will improve short breaks provision locally, achieve defined outcomes for children and young people, and will be sustainable beyond the grant intervention. Applications received by the deadline will be assessed by an appraisal panel against the scheme criteria. Post implementation evaluation and reporting requirements will ensure that successful schemes are able to demonstrate that they maximise the benefit for children and young people with disabilities across Herefordshire. Case studies and other monitoring information will be collated to ensure that the learning and impact from the grant scheme can be captured. |
Decision Maker: Cabinet member children and families
Decision published: 10/10/2019
Effective from: 17/10/2019
Decision:
That:
(a) A capital Short Breaks Grant Scheme with a non-recurring budget of £118,000 is made available for projects that will increase access to regular, inclusive universal and targeted activities to support children and young people with special educational needs and disabilities in Herefordshire;
(b) the Director for Children and Families be authorised to determine grant awards inaccordance with the scheme criteria and having regard to the recommendations of the appraisal panel established as set out in appendix 1.
Wards affected: (All Wards);
Lead officer: Amanda Price
10/10/2019 - U66402, The Common, Wellington Heath, Herefordshire Temporary Road Closure Order 2019 ref: 6370 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 10/10/2019
Effective from: 10/10/2019
Decision:
To authorise the making of a Temporary Road
Closure Order served under section 14(1) of the Road Traffic
Regulation Act 1984 to require a temporary closure on the U66402,
The Common, Wellington Heath, outside Dogberry Cottage, planned to
be effective for a period of 4 days commencing on the 18th of
November 2019.
Lead officer: Bruce Evans
10/10/2019 - U80005 East Street & U80016 Offa Street, Hereford, Herefordshire Temporary Road Closure Order 2019 ref: 6369 Recommendations Approved
Decision Maker: Officer Decision - Economy and Place (Historic)
Decision published: 10/10/2019
Effective from: 10/10/2019
Decision:
To authorise the making of a Temporary Road
Closure Order served under section 14(1) of the Road Traffic
Regulation Act 1984 to require a temporary closure on the roads
shown in Article 1 Schedule 1 of the Order as attached. The order
shall come into effect on 26th October 2019 for a period of 11
days.
Lead officer: Bruce Evans
10/10/2019 - Approval of contingency budget to finance “change events” that will mitigate risks occurring in the Shell Store project. ref: 6377 Recommendations Approved
Decision Maker: Director of Children and Families (Historic)
Decision published: 10/10/2019
Effective from: 10/10/2019
Decision:
Approve the use of £4,435.50 from the
Shell Store project contingency approved budget on specialist
explosives testing, and remediation and validation surveys and lead
testing.
Lead officer: Nick Webster
01/10/2019 - Street Trading Application Decision - A438 lay by near Tarrington ref: 6368 Recommendations Approved
Decision Maker: Assistant Director for Technical Services
Decision published: 10/10/2019
Effective from: 01/10/2019
Decision:
To approve the application for a street
trading consent
Lead officer: Kevin Price
05/07/2019 - Executive Response to the Climate Emergency Recommendations Approved
To approve the cabinet’s response to the climate emergency resolution that was unanimously supported at the meeting of full council on 8 March 2019.
To approve the cabinet’s response to the zero carbon citizen’s assembly resolution that was passed by council at the meeting of full council on 12 July 2019. |
Decision Maker: Cabinet
Decision due date: 26/09/2019
Wards affected: (All Wards);
Lead officer: Ben Boswell, Geoff Perrott
Notice of decision: 05/07/2019
Anticipated restriction: Open
17/01/2020 - Approval of continuation of annual rolling maintenance contract for Business World system ref: 6537 Recommendations Approved
To approve the continued maintenance of the Business World enterprise resource planning (ERP) information IT system.
The ERP IT system records, processes and documents all relevant information in relation to the general ledger, payroll, debtor and creditor records.
The current decision approval to maintain the system expires on 31 March 2020, this report recommends that the current arrangements continue for a further period of up to ten years.
The continued current arrangement is recommended because the ERP IT system has been substantially be-spoked to provide the IT support service required and Unit 4 are the only available current system maintenance provider to ensure the continued maintenance and support service the system requires to remain fit for purpose.
Decision Maker: Cabinet member finance and corporate services
Decision published:
Effective from: 24/01/2020
Decision:
That:
The annual rolling maintenance contract for the Business World ERP IT system continues with Unit 4 for a further ten year period, under Regulation 32 of the Public Contract Regulations 2015. The total annual maintenance and support cost is £114k.
Wards affected: (All Wards);
Lead officer: Josie Rushgrove